63 line items · $640M · starting 2026 · 1 plan
Orlando's published capital plans list 63 water, sewer and wastewater line items with a combined planning budget of $640M, of which 63 items worth $640M sit in the wastewater and sewer departments. The largest single item is Conserv I Treatment Plant Improvements at $147M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Conserv I Treatment Plant Improvements | Wastewater | Wastewater treatment plant upgrades | $147M | 2025–2028 |
| 2 | Conserv I Electrical Improvements | Wastewater | Generators, power and electrical | $44M | 2024–2026 |
| 3 | LS 1,2,3 and 4 Force Main Evaluation Phase 3 | Wastewater | Lift stations | $28M | 2024–2025 |
| 4 | Conserv II 480V Electrical Upgrades | Wastewater | Generators, power and electrical | $26M | 2024–2026 |
| 5 | Sanitary upgrades with other projects | Wastewater | Sewer rehabilitation and I&I | $20M | 2025–2029 |
| 6 | Conserv II Deep Bed Filters | Wastewater | Membranes and filtration | $20M | 2024–2025 |
| 7 | Minor Plant Upgrades and Installations | Wastewater | Vehicles and equipment | $18M | 2025–2029 |
| 8 | Lift Station Underground Rehabilitation | Wastewater | Lift stations | $17M | 2025–2029 |
| 9 | Iron Bridge Flow EQ System Improvements | Wastewater | Anaerobic digesters and biogas | $16M | 2024–2026 |
| 10 | Iron Bridge Biosolids Disposal Improvements | Wastewater | Biosolids, sludge and dewatering | $15M | 2026–2027 |
53 more line items in Orlando, with descriptions and contacts
Klarifi holds every Orlando line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$625M
61 items
2026
$15M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 63 | $640M | 100% |
No publicly owned treatment plant is recorded under Orlando in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Florida.
Sources and methodology
Budgets and years are as published in Orlando’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (63 line items).