36 line items · $1.1B · starting 2026–2030 · 1 plan
Cape Coral's published capital plans list 36 water, sewer and wastewater line items with a combined planning budget of $1.1B, of which 8 items worth $480M sit in the wastewater and sewer departments. The largest single item is North WRF 8 MGD (Phase 1) Expandable to 17 MGD at $243M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | North WRF 8 MGD (Phase 1) Expandable to 17 MGD | Water Distribution | Wastewater treatment plant upgrades | $243M | 2025–2027 |
| 2 | North 6 UEP Water, Sewer, Irrigation Collection & Distribution | Sewer | Sewer rehabilitation and I&I | $160M | 2025–2029 |
| 3 | North 6 UEP Water, Sewer, Irrigation Transmission | Sewer | Sewer rehabilitation and I&I | $109M | 2025–2029 |
| 4 | North 3 UEP Water, Sewer, Irrigation Collection & Distribution | Sewer | Sewer rehabilitation and I&I | $89M | 2027 |
| 5 | North 3 UEP Water, Sewer, Irrigation Transmission | Sewer | Sewer rehabilitation and I&I | $77M | 2027 |
| 6 | NRO RO WTP Wellfield Expansion Phase II | Water Supply | Membranes and filtration | $54M | 2025–2028 |
| 7 | SW WRF Improvements (Headworks, Filters, Raw Main) | Water Supply | Headworks, screening and grit | $53M | 2026 |
| 8 | NRO RO WTP Expansion Phase II & 12 MG Potable Water | Water Supply | Membranes and filtration | $41M | 2026 |
| 9 | ADM-56 US 41 Conveyance | Water Distribution | Pump stations | $40M | 2025 |
| 10 | North RO WTP and WRF Deep Injection Well | Water Supply | Membranes and filtration | $22M | 2028 |
26 more line items in Cape Coral, with descriptions and contacts
Klarifi holds every Cape Coral line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$643M
11 items
2026
$131M
7 items
2027
$230M
9 items
2028
$57M
4 items
2029
$54M
4 items
2030
$20M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $26M | 2% |
| Sewer | 6 | $454M | 40% |
| Water Supply | 4 | $171M | 15% |
| Water Distribution | 24 | $484M | 43% |
1 publicly owned treatment plant in Cape Coral. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Everest Parkway WRF | 9.29 | FL0030007 | 0 |
Sources and methodology
Budgets and years are as published in Cape Coral’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (36 line items).
Data refreshed September 11, 2026.