29 line items · $556M · starting 2026–2029 · 1 plan
Fort Myers's published capital plans list 29 water, sewer and wastewater line items with a combined planning budget of $556M, of which 12 items worth $315M sit in the wastewater and sewer departments. The largest single item is Reclaimed Water Production 100% CWWTP at $116M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Reclaimed Water Production 100% CWWTP | Wastewater | Water treatment plants | $116M | 2025–2029 |
| 2 | Water Treatment Plant Expansion | Water Supply | Wastewater treatment plant upgrades | $76M | 2025–2027 |
| 3 | Wellfield Expansion | Water Supply | Wells and groundwater | $56M | 2025–2028 |
| 4 | Injection Well-DEP Requirement CWWTP | Wastewater | Wells and groundwater | $49M | 2025–2026 |
| 5 | Injection Well - DEP Requirement SWWTP | Wastewater | Wells and groundwater | $48M | 2027–2029 |
| 6 | Midtown Water/Sewer Evans – MLK – Edison | Sewer | Sewer rehabilitation and I&I | $28M | 2025–2029 |
| 7 | Piping Distribution System Improvements | Water Supply | Water mains and distribution | $28M | 2026–2029 |
| 8 | Reuse Facility at South Plant SWWTP | Wastewater | Water reuse and reclaimed water | $27M | 2025–2029 |
| 9 | SSES Implementation | Water Supply | — | $21M | 2026–2029 |
| 10 | Service Line Replacements | Water Distribution | Water mains and distribution | $17M | 2025–2029 |
19 more line items in Fort Myers, with descriptions and contacts
Klarifi holds every Fort Myers line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$418M
17 items
2026
$82M
9 items
2027
$50M
2 items
2029
$5M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 10 | $285M | 51% |
| Sewer | 2 | $31M | 5% |
| Water Supply | 12 | $209M | 38% |
| Water Distribution | 5 | $31M | 6% |
1 publicly owned treatment plant in Fort Myers with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Fiesta Village Advance Wastewater Treatment Plant | 2.76 | FL0039829 | 1 |
Sources and methodology
Budgets and years are as published in Fort Myers’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (29 line items).
Data refreshed October 12, 2026.