Winter Haven, Florida: water and wastewater capital improvement projects

49 line items · $347M · starting 2026–2027 · 1 plan

Winter Haven's published capital plans list 49 water, sewer and wastewater line items with a combined planning budget of $347M, of which 25 items worth $275M sit in the wastewater and sewer departments. The largest single item is WWTP #3 Expansion at $180M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Winter Haven

The 10 largest water, sewer and wastewater line items in Winter Haven’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WWTP #3 ExpansionSewerWastewater treatment plant upgrades$180M2025–2029
2ONE Water Peace Creek Projects DevelopmentSewerWells and groundwater$14M2025–2028
3Pollard Road WTPSewerWater treatment plants$13M2025–2027
4Winter Haven Water Admin/Maintenance Facility Design/BuildWater DistributionVehicles and equipment$11M2025–2026
5WWTP #2 Upgrades Design/ConstructionWastewaterWastewater treatment plant upgrades$10M2026–2028
6Water Main Transmission ExpansionWater DistributionWater mains and distribution$9M2025–2029
7Cypresswood WTP ImprovementsSewerWater treatment plants$8M2025–2027
8East Peace Creek Flood MitigationWater DistributionStormwater and flood resilience$6M2025–2029
9Elevated Water Tower (SR-60)Water DistributionStorage tanks and reservoirs$6M2027–2029
10Lift Station ReplacementSewerLift stations$6M2025–2029

39 more line items in Winter Haven, with descriptions and contacts

Klarifi holds every Winter Haven line item with its description, the page it appears on and the source document, plus 10 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$313M

36 items

2026

$23M

9 items

2027

$11M

4 items

By department

Line items and planning budgets by department, Winter Haven.
DepartmentLine itemsBudgetShare
Wastewater6$19M5%
Sewer19$256M74%
Water Supply10$20M6%
Water Distribution14$52M15%

Project types in Winter Haven's plan

Wastewater treatment plants in Winter Haven

1 publicly owned treatment plant in Winter Haven with 35 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Winter Haven - Wastewater Treatment Plant 36.04FL003604835

Other Florida cities with capital plans

Winter Haven capital plan questions

Sources and methodology

Budgets and years are as published in Winter Haven’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (49 line items).

Data refreshed September 11, 2026.