49 line items · $347M · starting 2026–2027 · 1 plan
Winter Haven's published capital plans list 49 water, sewer and wastewater line items with a combined planning budget of $347M, of which 25 items worth $275M sit in the wastewater and sewer departments. The largest single item is WWTP #3 Expansion at $180M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | WWTP #3 Expansion | Sewer | Wastewater treatment plant upgrades | $180M | 2025–2029 |
| 2 | ONE Water Peace Creek Projects Development | Sewer | Wells and groundwater | $14M | 2025–2028 |
| 3 | Pollard Road WTP | Sewer | Water treatment plants | $13M | 2025–2027 |
| 4 | Winter Haven Water Admin/Maintenance Facility Design/Build | Water Distribution | Vehicles and equipment | $11M | 2025–2026 |
| 5 | WWTP #2 Upgrades Design/Construction | Wastewater | Wastewater treatment plant upgrades | $10M | 2026–2028 |
| 6 | Water Main Transmission Expansion | Water Distribution | Water mains and distribution | $9M | 2025–2029 |
| 7 | Cypresswood WTP Improvements | Sewer | Water treatment plants | $8M | 2025–2027 |
| 8 | East Peace Creek Flood Mitigation | Water Distribution | Stormwater and flood resilience | $6M | 2025–2029 |
| 9 | Elevated Water Tower (SR-60) | Water Distribution | Storage tanks and reservoirs | $6M | 2027–2029 |
| 10 | Lift Station Replacement | Sewer | Lift stations | $6M | 2025–2029 |
39 more line items in Winter Haven, with descriptions and contacts
Klarifi holds every Winter Haven line item with its description, the page it appears on and the source document, plus 10 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$313M
36 items
2026
$23M
9 items
2027
$11M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 6 | $19M | 5% |
| Sewer | 19 | $256M | 74% |
| Water Supply | 10 | $20M | 6% |
| Water Distribution | 14 | $52M | 15% |
1 publicly owned treatment plant in Winter Haven with 35 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Winter Haven - Wastewater Treatment Plant 3 | 6.04 | FL0036048 | 35 |
Sources and methodology
Budgets and years are as published in Winter Haven’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (49 line items).
Data refreshed September 11, 2026.