5 line items · $2M · starting 2026–2028 · 1 plan
Pekin's published capital plans list 5 water, sewer and wastewater line items with a combined planning budget of $2M, of which 5 items worth $2M sit in the wastewater and sewer departments. The largest single item is Lift Station Rehabs at $2M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Lift Station Rehabs | Sewer | Lift stations | $2M | 2026–2027 |
| 2 | WWTP Building Repairs | Wastewater | Wastewater treatment plant upgrades | $300K | 2026 |
| 3 | WWTP Digester Replacement | Wastewater | Anaerobic digesters and biogas | $60K | 2026 |
| 4 | Blower Motors for WWTP | Wastewater | Aeration and blowers | $50K | 2026 |
| 5 | Sewers - New Jetter Head for Vactor Truck | Sewer | Sewer rehabilitation and I&I | $50K | 2028 |
Descriptions, page references and contacts for Pekin
Klarifi holds every Pekin line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$2M
4 items
2028
$50K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 3 | $410K | 17% |
| Sewer | 2 | $2M | 83% |
1 publicly owned treatment plant in Pekin with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Pekin STP #1 | 2.4 | ILL034495 | 7 |
Sources and methodology
Budgets and years are as published in Pekin’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025–2026 (5 line items).