59 line items · $82M · starting 2026–2027 · 1 plan
Moline's published capital plans list 59 water, sewer and wastewater line items with a combined planning budget of $82M, of which 31 items worth $65M sit in the wastewater and sewer departments. The largest single item is South Slope Construction (and Engineering) at $56M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | South Slope Construction (and Engineering) | Wastewater | — | $56M | 2025–2027 |
| 2 | Lead Service Replacements | Water Distribution | Lead service line replacement | $9M | 2025–2027 |
| 3 | Water Treatment Plant Improvement Planning Study Recommendation | Water Supply | Wastewater treatment plant upgrades | $2M | 2025–2027 |
| 4 | Per- and Polyfluoroalkyl Substances Powdered Activated Carbon Installation | Wastewater | PFAS treatment | $2M | 2026 |
| 5 | Sewer Lining | Wastewater | Sewer rehabilitation and I&I | $1M | 2025–2027 |
| 6 | South Slope Design | Wastewater | — | $1M | 2025 |
| 7 | Street Patching | Water Distribution | Water mains and distribution | $870K | 2025–2027 |
| 8 | Maintenance Garage Building Addition | Water Distribution | Buildings, HVAC and site work | $850K | 2026 |
| 9 | Cybersecurity 2 | Water Supply | SCADA, controls and instrumentation | $800K | 2025 |
| 10 | 30th Avenue, 14th–16th Street | Wastewater | — | $700K | 2025 |
49 more line items in Moline, with descriptions and contacts
Klarifi holds every Moline line item with its description, the page it appears on and the source document, plus 13 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$75M
26 items
2026
$5M
22 items
2027
$2M
11 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 31 | $65M | 80% |
| Water Supply | 2 | $3M | 4% |
| Water Distribution | 26 | $13M | 16% |
2 publicly owned treatment plants in Moline with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| North Slope Treatment Plant | 3.43 | ILL029947 | 1 |
| Moline South Treatment Plant | 2.72 | ILL029939 | 3 |
Sources and methodology
Budgets and years are as published in Moline’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2027 (59 line items).
Data refreshed September 11, 2026.