12 line items · $74M · starting 2026 · 1 plan
Skokie's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $74M, of which 3 items worth $5M sit in the wastewater and sewer departments. The largest single item is Water Main Replacement at $40M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Main Replacement | Water Distribution | Water mains and distribution | $40M | 2026–2030 |
| 2 | Lead Service Line Replacement | Water Distribution | Lead service line replacement | $21M | 2026–2030 |
| 3 | Sewer System Rehabilitation | Sewer | Sewer rehabilitation and I&I | $5M | 2026–2030 |
| 4 | Congressionally Directed Spending | Water Supply | — | $2M | 2026 |
| 5 | Fire Hydrants: 50 @ $4,500 | Water Distribution | Water mains and distribution | $1M | 2026–2030 |
| 6 | Water System Contingency | Water Supply | — | $1M | 2026–2030 |
| 7 | Professional Services | Water Supply | Planning, studies and asset management | $1M | 2026–2030 |
| 8 | Distribution Valve replacement Various Locations | Water Distribution | Water mains and distribution | $1M | 2026–2030 |
| 9 | Water Meters/Receptacles | Water Distribution | Meters and AMI | $875K | 2026–2030 |
| 10 | Professional Services | Sewer | Planning, studies and asset management | $250K | 2026–2030 |
2 more line items in Skokie, with descriptions and contacts
Klarifi holds every Skokie line item with its description, the page it appears on and the source document, plus 8 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$74M
12 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 3 | $5M | 7% |
| Water Supply | 4 | $4M | 6% |
| Water Distribution | 5 | $64M | 87% |
1 publicly owned treatment plant in Skokie with 18 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| MWRDGC Terrence J O'Brien Water Reclamation Plant | 170 | IL0028088 | 18 |
Sources and methodology
Budgets and years are as published in Skokie’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2026 (12 line items).
Data refreshed September 11, 2026.