6 line items · $17M · 1 plan
Urbana's published capital plans list 6 water, sewer and wastewater line items with a combined planning budget of $17M, of which 6 items worth $17M sit in the wastewater and sewer departments. The largest single item is Sewer Cleaning and Televising at $7M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sewer Cleaning and Televising | Sewer | Sewer rehabilitation and I&I | $7M | 2025–2030 |
| 2 | Sewer Lining | Sewer | Sewer rehabilitation and I&I | $5M | 2025–2030 |
| 3 | Miscellaneous Sewer Repairs | Sewer | Sewer rehabilitation and I&I | $4M | 2025–2030 |
| 4 | Sanitary Sewer Lateral Lining | Sewer | Sewer rehabilitation and I&I | $793K | 2025–2026 |
| 5 | Sewer and Floodplain Modeling | Sewer | Sewer rehabilitation and I&I | $346K | 2025–2026 |
| 6 | Public Sanitary Sewer Service Gaps | Sewer | Sewer rehabilitation and I&I | $56K | 2025 |
Descriptions, page references and contacts for Urbana
Klarifi holds every Urbana line item with its description, the page it appears on and the source document, plus 5 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$17M
6 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 6 | $17M | 100% |
1 publicly owned treatment plant in Urbana with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Urbana & Champaign Sd | 6.2 | ILL031500 | 2 |
Sources and methodology
Budgets and years are as published in Urbana’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (6 line items).
Data refreshed September 11, 2026.