Baton Rouge, Louisiana: water and wastewater capital improvement projects
Water, sewer and wastewater line items in Baton Rouge’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $10M
- Line items
- 5
- Wastewater and sewer
- $10M
- Plan
- 1
Baton Rouge's published capital plans list 5 water, sewer and wastewater line items with a combined planning budget of $10M, of which 5 items worth $10M sit in the wastewater and sewer departments. The largest single item is Sewer Collection System Investigation and Maintenance Program at $4M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Baton Rouge
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sewer Collection System Investigation and Maintenance Program | Sewer | Sewer rehabilitation and I&I | $4M | 2025 |
| 2 | Generator Maintenance Program | Sewer | Generators, power and electrical | $2M | 2025 |
| 3 | Emergency Sewer Point-Repair Program | Sewer | Sewer rehabilitation and I&I | $2M | 2025 |
| 4 | Operations and Maintenance | Sewer | — | $1M | 2025 |
| 5 | Odor Control Maintenance Program | Sewer | Odor and corrosion control | $400K | 2025 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 5 | $10M | 100% |
Project types in Baton Rouge's plan
- Sewer rehabilitation and I&I2 line items$6M
- Generators, power and electrical1 line items$2M
- Odor and corrosion control1 line items$400K
Wastewater treatment plants in Baton Rouge
1 publicly owned treatment plant in Baton Rouge with 21 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| South Wastewater Treatment Plant | 41.45 | LA0036412 | 21 |
Other Louisiana cities with capital plans
- $267M
- $192M
- $189M
- $69M
- $19M
- $6M
Baton Rouge capital plan questions
How much is Baton Rouge, LA planning to spend on water and sewer infrastructure?
Baton Rouge’s published capital plans list 5 water, sewer and wastewater line items with a combined budget of $10M, of which $10M is in the wastewater and sewer departments.
What is the largest capital project in Baton Rouge’s plan?
Sewer Collection System Investigation and Maintenance Program, budgeted at $4M and scheduled for 2025 under the Sewer department.
How do I find the contacts and full project list for Baton Rouge?
Klarifi holds every line item with its description, page reference and source document, plus 29 verified contacts at the city’s treatment plants. The public page shows the ten largest items; the full list is available with a free trial.