200 planned projects · $750M · 7 cities · 7 plans
The 7 capital improvement plans and adopted budgets Klarifi has extracted for Louisiana list 200 water, sewer and wastewater line items with a combined planning budget of $750M across 7 cities. Elmwood has the largest plan at $267M. Each city page lists its largest projects with budgets and years, links the source document and the city's treatment plants.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | City | Line items | Budget | Plans |
|---|---|---|---|---|
| 1 | Elmwood | 25 | $267M | 1 |
| 2 | Lafayette | 83 | $192M | 1 |
| 3 | Geismar | 21 | $189M | 1 |
| 4 | Monroe | 9 | $69M | 1 |
| 5 | Chalmette | 15 | $19M | 1 |
| 6 | Baton Rouge | 5 | $10M | 1 |
| 7 | Killona | 42 | $6M | 1 |
Before 2026
$661M
178 items
2026
$71M
17 items
2027
$13M
3 items
2028
$4M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 58 | $121M | 16% |
| Sewer | 28 | $210M | 28% |
| Water Supply | 75 | $247M | 33% |
| Water Distribution | 39 | $171M | 23% |
| # | Project | City | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Pipe Replacement | Elmwood, LA | Water mains and distribution | $101M | 2025–2029 |
| 2 | Pipe Replacement Program | Elmwood, LA | Water mains and distribution | $88M | 2025–2029 |
| 3 | New River Stormwater Pump Station w/Hwy 74 Structure | Geismar, LA | Pump stations | $61M | 2025–2029 |
| 4 | Galvanized Main Replacement | Lafayette, LA | Water mains and distribution | $39M | 2024–2029 |
| 5 | South Plant Flow Handling - Phase II | Lafayette, LA | — | $32M | 2024–2027 |
| 6 | ADAPT Future Program | Geismar, LA | — | $25M | 2025–2029 |
| 7 | Sewer FY26-FY30 (WPCC) | Monroe, LA | Sewer rehabilitation and I&I | $23M | 2026–2030 |
| 8 | Laurel Ridge Levee Raise | Geismar, LA | Stormwater and flood resilience | $19M | 2025–2027 |
| 9 | Water FY26-FY30 (Distribution & Transmission) | Monroe, LA | Water mains and distribution | $18M | 2026–2030 |
| 10 | Rehabilitation Program-Point Repair Contract | Elmwood, LA | — | $15M | 2025–2029 |
All 200 Louisiana line items in Klarifi
Every project with its description, page reference and source document, filterable by city, department, type, budget and year, linked to the plants and decision-makers in each city.
Sources and methodology
Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Data refreshed September 11, 2026.