25 line items · $267M · 1 plan
Elmwood's published capital plans list 25 water, sewer and wastewater line items with a combined planning budget of $267M, of which 16 items worth $153M sit in the wastewater and sewer departments. The largest single item is Pipe Replacement at $101M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Pipe Replacement | Sewer | Water mains and distribution | $101M | 2025–2029 |
| 2 | Pipe Replacement Program | Water Distribution | Water mains and distribution | $88M | 2025–2029 |
| 3 | Rehabilitation Program-Point Repair Contract | Sewer | — | $15M | 2025–2029 |
| 4 | Equipment Purchases | Sewer | Vehicles and equipment | $8M | 2025–2029 |
| 5 | Advance Metering Infrastructure | Water Distribution | Meters and AMI | $7M | 2025 |
| 6 | Road and Sewer Bond Program Management-Sewer | Sewer | Sewer rehabilitation and I&I | $7M | 2025–2029 |
| 7 | Treatment Plant Improvements | Sewer | Wastewater treatment plant upgrades | $7M | 2025–2029 |
| 8 | Plant Equipment | Water Supply | Vehicles and equipment | $5M | 2025 |
| 9 | East Bank Water Towers Rehab | Water Distribution | Storage tanks and reservoirs | $3M | 2025 |
| 10 | Hydrant Replacement-Warehouse | Water Supply | Water mains and distribution | $3M | 2025–2029 |
15 more line items in Elmwood, with descriptions and contacts
Klarifi holds every Elmwood line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$267M
25 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 16 | $153M | 57% |
| Water Supply | 4 | $11M | 4% |
| Water Distribution | 5 | $103M | 39% |
1 publicly owned treatment plant in Elmwood. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Jefferson Parish Department Of Sewerage- East Bank WWTP | 20.66 | LA0066630 | 0 |
Sources and methodology
Budgets and years are as published in Elmwood’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025 (25 line items).