Chalmette, Louisiana: water and wastewater capital improvement projects

15 line items · $19M · 1 plan

Chalmette's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $19M, of which 14 items worth $16M sit in the wastewater and sewer departments. The largest single item is Riverbend Consolidation at $7M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Chalmette

The 10 largest water, sewer and wastewater line items in Chalmette’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Riverbend ConsolidationWastewater$7M2025
2Replacement and Maintenance of Water MetersWater DistributionMeters and AMI$3M2025
3Water Project 3.2Wastewater$2M2025
4Water and Sewer Point Repairs – Routine MaintenanceSewerSewer rehabilitation and I&I$1M2025
5Water Project 3.4Wastewater$1M2025
6Water Project 3.3Wastewater$1M2025
7Water Project 4.2Wastewater$1M2025
8Water Project 4.1Wastewater$815K2025
9Repair and Maintenance of Buildings and FacilitiesWastewaterBuildings, HVAC and site work$400K2025
10Repair and Maintenance of RoadsWastewater$250K2025

5 more line items in Chalmette, with descriptions and contacts

Klarifi holds every Chalmette line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$19M

15 items

By department

Line items and planning budgets by department, Chalmette.
DepartmentLine itemsBudgetShare
Wastewater12$15M78%
Sewer2$1M8%
Water Distribution1$3M14%

Wastewater treatment plants in Chalmette

2 publicly owned treatment plants in Chalmette with 181 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
St. Bernard Parish - Munster WWTP3.77LA00401772
Riverbend Oxidation Pond - Poydras-Verret Wetland0.28LA0040185179

Other Louisiana cities with capital plans

Chalmette capital plan questions

Sources and methodology

Budgets and years are as published in Chalmette’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2025 (15 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free