15 line items · $19M · 1 plan
Chalmette's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $19M, of which 14 items worth $16M sit in the wastewater and sewer departments. The largest single item is Riverbend Consolidation at $7M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Riverbend Consolidation | Wastewater | — | $7M | 2025 |
| 2 | Replacement and Maintenance of Water Meters | Water Distribution | Meters and AMI | $3M | 2025 |
| 3 | Water Project 3.2 | Wastewater | — | $2M | 2025 |
| 4 | Water and Sewer Point Repairs – Routine Maintenance | Sewer | Sewer rehabilitation and I&I | $1M | 2025 |
| 5 | Water Project 3.4 | Wastewater | — | $1M | 2025 |
| 6 | Water Project 3.3 | Wastewater | — | $1M | 2025 |
| 7 | Water Project 4.2 | Wastewater | — | $1M | 2025 |
| 8 | Water Project 4.1 | Wastewater | — | $815K | 2025 |
| 9 | Repair and Maintenance of Buildings and Facilities | Wastewater | Buildings, HVAC and site work | $400K | 2025 |
| 10 | Repair and Maintenance of Roads | Wastewater | — | $250K | 2025 |
5 more line items in Chalmette, with descriptions and contacts
Klarifi holds every Chalmette line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$19M
15 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 12 | $15M | 78% |
| Sewer | 2 | $1M | 8% |
| Water Distribution | 1 | $3M | 14% |
2 publicly owned treatment plants in Chalmette with 181 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| St. Bernard Parish - Munster WWTP | 3.77 | LA0040177 | 2 |
| Riverbend Oxidation Pond - Poydras-Verret Wetland | 0.28 | LA0040185 | 179 |
Sources and methodology
Budgets and years are as published in Chalmette’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025 (15 line items).
Data refreshed September 11, 2026.