83 line items · $192M · starting 2026–2028 · 1 plan
Lafayette's published capital plans list 83 water, sewer and wastewater line items with a combined planning budget of $192M, of which 46 items worth $106M sit in the wastewater and sewer departments. The largest single item is Galvanized Main Replacement at $39M (2024–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Galvanized Main Replacement | Water Distribution | Water mains and distribution | $39M | 2024–2029 |
| 2 | South Plant Flow Handling - Phase II | Wastewater | — | $32M | 2024–2027 |
| 3 | Collection System Imprv (Annual) | Wastewater | Sewer rehabilitation and I&I | $13M | 2024–2029 |
| 4 | Lift Station Modifications & Improvements | Wastewater | Lift stations | $9M | 2024–2029 |
| 5 | ESTP Sludge Dryer | Wastewater | Biosolids, sludge and dewatering | $6M | 2026–2028 |
| 6 | Transmission Main Installation (NWTP) | Water Distribution | Water mains and distribution | $6M | 2024–2028 |
| 7 | Additional Ground Storage Tank NWTP | Water Supply | Storage tanks and reservoirs | $5M | 2024–2026 |
| 8 | Plant Expansion NETP | Wastewater | Wastewater treatment plant upgrades | $4M | 2024–2027 |
| 9 | University Gravity Sewer Upsize | Wastewater | Sewer rehabilitation and I&I | $4M | 2024–2027 |
| 10 | NWTP Emergency Backup Power | Water Supply | Generators, power and electrical | $4M | 2028–2029 |
73 more line items in Lafayette, with descriptions and contacts
Klarifi holds every Lafayette line item with its description, the page it appears on and the source document, plus 39 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$172M
71 items
2026
$15M
9 items
2027
$500K
1 items
2028
$4M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 46 | $106M | 55% |
| Water Supply | 15 | $21M | 11% |
| Water Distribution | 22 | $64M | 34% |
5 publicly owned treatment plants in Lafayette with 10 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Lafayette Consolidated Government - Ambassador Caffery STP | 4.38 | LA0042561 | 0 |
| Lafayette Consolidated Government - East WWTP | 2.36 | LAL036382 | 1 |
| Lafayette Consolidated Government - Northeast WWTP | 1.16 | LAL036391 | 0 |
| South Water Treatment Plant | 0.02 | LA0079278 | 4 |
| Lafayette Consolidated Govt | 0.0045 | LA0117161 | 5 |
Sources and methodology
Budgets and years are as published in Lafayette’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (83 line items).
Data refreshed September 11, 2026.