Cadillac, Michigan: water and wastewater capital improvement projects

81 line items · $16M · starting 2026–2030 · 2 plans

Cadillac's published capital plans list 81 water, sewer and wastewater line items with a combined planning budget of $16M, of which 71 items worth $15M sit in the wastewater and sewer departments. The largest single item is WWTP Headworks Project at $4M (2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Cadillac

The 10 largest water, sewer and wastewater line items in Cadillac’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WWTP Headworks ProjectWastewaterHeadworks, screening and grit$4M2027
2Sewer LiningSewerSewer rehabilitation and I&I$1M2025–2030
3Gas Storage and Energy ProductionWastewaterBiosolids, sludge and dewatering$600K2025
4Gas Storage and Energy ProductionWastewaterBiosolids, sludge and dewatering$600K2030
5Sewer Combo UnitWastewaterSewer rehabilitation and I&I$550K2029
6Sewer Combo UnitWastewaterSewer rehabilitation and I&I$550K2029
7Sewer LiningWastewaterSewer rehabilitation and I&I$500K2025
8Sewer LiningSewerSewer rehabilitation and I&I$500K2026
9Sewer LiningSewerSewer rehabilitation and I&I$500K2027
10Automated Screen and Screw ConveyorWastewaterHeadworks, screening and grit$400K2028

71 more line items in Cadillac, with descriptions and contacts

Klarifi holds every Cadillac line item with its description, the page it appears on and the source document, plus 14 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$4M

21 items

2026

$3M

25 items

2027

$5M

20 items

2028

$2M

5 items

2029

$2M

9 items

2030

$600K

1 items

By department

Line items and planning budgets by department, Cadillac.
DepartmentLine itemsBudgetShare
Wastewater58$11M70%
Sewer13$4M23%
Water Supply1$10K0%
Water Distribution9$1M7%

Project types in Cadillac's plan

Wastewater treatment plants in Cadillac

1 publicly owned treatment plant in Cadillac with 18 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Cadillac WWTP1.81MI002025718

Other Michigan cities with capital plans

Cadillac capital plan questions

Sources and methodology

Budgets and years are as published in Cadillac’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (39 line items); CIP 2024–2029 (42 line items).

Data refreshed September 11, 2026.