Howell, Michigan: water and wastewater capital improvement projects

5 line items · $605K · 1 plan

Howell's published capital plans list 5 water, sewer and wastewater line items with a combined planning budget of $605K, of which 5 items worth $605K sit in the wastewater and sewer departments. The largest single item is Peninsula Station Replacement at $250K (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Howell

The 5 largest water, sewer and wastewater line items in Howell’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Peninsula Station ReplacementWastewater$250K2024–2025
2Roselane Station ReplacementWastewater$250K2024–2025
3Sewer Repairs per the AMPSewerSewer rehabilitation and I&I$100K2024–2025
4GPS UnitWastewater$4K2024–2025
5BS&A Cloud UB ModuleWastewater$1K2024–2025

Descriptions, page references and contacts for Howell

Klarifi holds every Howell line item with its description, the page it appears on and the source document, plus 49 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$605K

5 items

By department

Line items and planning budgets by department, Howell.
DepartmentLine itemsBudgetShare
Wastewater4$505K83%
Sewer1$100K17%

Wastewater treatment plants in Howell

3 publicly owned treatment plants in Howell with 41 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Genoa-Oceola WWTP1.36MI00556541
Howell WWTP1.14MI002111339
Howell Twp WWTP0.3MI00557271

Other Michigan cities with capital plans

Howell capital plan questions

Sources and methodology

Budgets and years are as published in Howell’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2025 (5 line items).

Data refreshed September 11, 2026.