28 line items · $10M · starting 2026–2029 · 1 plan
Unionville's published capital plans list 28 water, sewer and wastewater line items with a combined planning budget of $10M, of which 19 items worth $9M sit in the wastewater and sewer departments. The largest single item is WWTP Sludge Storage Unit original deduct of 459,138 wwtp project in 2013 (est. construction 2023) cost estimate updated 2023 CWSRF Project Plan at $3M (2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | WWTP Sludge Storage Unit original deduct of 459,138 wwtp project in 2013 (est. construction 2023) cost estimate updated 2023 CWSRF Project Plan | Sewer | Biosolids, sludge and dewatering | $3M | 2027 |
| 2 | WWTP - Screw Pump #1 & #2 Replacement (20 - 25 year life cycle - (est. construction 2026) cost estimate updated 2023 CWSRF Project Plan | Sewer | Pump stations | $943K | 2027 |
| 3 | Sanitary Sewer Manhole Repair/Pump Station Floor Coating | Sewer | Pump stations | $740K | 2025–2029 |
| 4 | Pump Station Upgrades/Rehabilitation (Pump Station #5 Concourse Drive) moved to 2025 due to permitting issues - permit submitted February 2024 to EGLE- cost estimate updated 2023 CWSRF Project Plan | Sewer | Pump stations | $675K | 2025 |
| 5 | WWTP Fine Screen Installation (second fine screen installation ) (est construction- 2023) - cost estimate updated 2023 CWSRF Project Plan | Sewer | Headworks, screening and grit | $600K | 2025 |
| 6 | Pump Station Upgrade/Rehabilitation (Pump Station #4 1660 Belmont) - cost estimate updated 2023 CWSRF Project Plan | Sewer | Pump stations | $585K | 2026 |
| 7 | Bypass Manhole Rehab & Pump Station Rehabilitation (#9 Mission Road) - requires easement | Sewer | Pump stations | $575K | 2026 |
| 8 | Isabella ground storage tank - replacement of protective cathode seams | Water Supply | Storage tanks and reservoirs | $350K | 2026 |
| 9 | Pump Station #3 - Broomfield Road- 105 HP Pump Replacement, valve rehabilitation, valute replacement | Sewer | Pump stations | $350K | 2029 |
| 10 | Pump Station Upgrades/Rehabilitation (Pump Station #2- Isabella Road) construction & engineering moved to 2025 due to availability of parts, permitting, and engineering | Sewer | Pump stations | $275K | 2025 |
18 more line items in Unionville, with descriptions and contacts
Klarifi holds every Unionville line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$3M
10 items
2026
$2M
7 items
2027
$4M
5 items
2028
$775K
4 items
2029
$550K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 19 | $9M | 89% |
| Water Supply | 9 | $1M | 11% |
1 publicly owned treatment plant in Unionville. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Unionville Wwsl | — | MIG580088 | 0 |
Sources and methodology
Budgets and years are as published in Unionville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025 (28 line items).