39 line items · $8M · starting 2026–2031 · 1 plan
Wixom's published capital plans list 39 water, sewer and wastewater line items with a combined planning budget of $8M, of which 39 items worth $8M sit in the wastewater and sewer departments. The largest single item is UV Disinfection Replacement at $2M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | UV Disinfection Replacement | Wastewater | Disinfection and UV | $2M | 2025–2026 |
| 2 | SAW Collection System Recommendations | Wastewater | Sewer rehabilitation and I&I | $722K | 2024–2033 |
| 3 | Contract Repair & Replace | Wastewater | — | $720K | 2024–2033 |
| 4 | Sewer/Manhole Repairs | Wastewater | Sewer rehabilitation and I&I | $637K | 2024–2033 |
| 5 | Solids Handling of Special Wastes | Wastewater | Biosolids, sludge and dewatering | $607K | 2024–2028 |
| 6 | Influent Wetwell Rehabilitation | Wastewater | — | $350K | 2027–2028 |
| 7 | Roof Replacement / Repair | Wastewater | Buildings, HVAC and site work | $250K | 2024–2031 |
| 8 | Sul-Air Compressor Replacement | Wastewater | — | $207K | 2025–2030 |
| 9 | HVAC Improvements | Wastewater | Buildings, HVAC and site work | $203K | 2024–2029 |
| 10 | Frank Street Lift Station Rehabilitation | Wastewater | Lift stations | $178K | 2026–2032 |
29 more line items in Wixom, with descriptions and contacts
Klarifi holds every Wixom line item with its description, the page it appears on and the source document, plus 32 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$6M
17 items
2026
$547K
6 items
2027
$512K
3 items
2029
$261K
4 items
2030
$288K
3 items
2031
$150K
2 items
2032 and later
$140K
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 39 | $8M | 100% |
1 publicly owned treatment plant in Wixom with 14 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Wixom WWTP | 1.39 | MI0024384 | 14 |
Sources and methodology
Budgets and years are as published in Wixom’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2024–2025 (39 line items).
Data refreshed September 11, 2026.