Long Beach, New York: water and wastewater capital improvement projects

13 line items · $30M · starting 2026–2028 · 1 plan

Long Beach's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $30M, of which 4 items worth $4M sit in the wastewater and sewer departments. The largest single item is Elevated Tank Repl/Standpipe Demolition at $10M (2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Long Beach

The 10 largest water, sewer and wastewater line items in Long Beach’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Elevated Tank Repl/Standpipe DemolitionWater SupplyStorage tanks and reservoirs$10M2027
2Water System Upgrades - VariousWater DistributionWater mains and distribution$6M2026–2030
3Supply Well Replacement #19Water SupplyWells and groundwater$4M2028
4Water Meter ReplacementWater DistributionMeters and AMI$3M2026–2027
5WWTP HmpWastewaterWastewater treatment plant upgrades$2M2026
6High Pressure Filter RehabilitationWater SupplyMembranes and filtration$1M2026
7SCADAWater SupplySCADA, controls and instrumentation$850K2026–2027
8Sewer UpgradesSewerSewer rehabilitation and I&I$750K2026–2028
9Various Plant ImprovementsWater SupplyWastewater treatment plant upgrades$700K2026–2030
10Sewer Main LiningSewerSewer rehabilitation and I&I$600K2026–2028

3 more line items in Long Beach, with descriptions and contacts

Klarifi holds every Long Beach line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$16M

11 items

2027

$10M

1 items

2028

$4M

1 items

By department

Line items and planning budgets by department, Long Beach.
DepartmentLine itemsBudgetShare
Wastewater1$2M7%
Sewer3$2M5%
Water Supply7$17M57%
Water Distribution2$9M31%

Project types in Long Beach's plan

Wastewater treatment plants in Long Beach

1 publicly owned treatment plant in Long Beach with 83 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Long Beach (c) WPCP4.53NY002056783

Other New York cities with capital plans

Long Beach capital plan questions

Sources and methodology

Budgets and years are as published in Long Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (13 line items).

Data refreshed September 11, 2026.