13 line items · $30M · starting 2026–2028 · 1 plan
Long Beach's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $30M, of which 4 items worth $4M sit in the wastewater and sewer departments. The largest single item is Elevated Tank Repl/Standpipe Demolition at $10M (2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Elevated Tank Repl/Standpipe Demolition | Water Supply | Storage tanks and reservoirs | $10M | 2027 |
| 2 | Water System Upgrades - Various | Water Distribution | Water mains and distribution | $6M | 2026–2030 |
| 3 | Supply Well Replacement #19 | Water Supply | Wells and groundwater | $4M | 2028 |
| 4 | Water Meter Replacement | Water Distribution | Meters and AMI | $3M | 2026–2027 |
| 5 | WWTP Hmp | Wastewater | Wastewater treatment plant upgrades | $2M | 2026 |
| 6 | High Pressure Filter Rehabilitation | Water Supply | Membranes and filtration | $1M | 2026 |
| 7 | SCADA | Water Supply | SCADA, controls and instrumentation | $850K | 2026–2027 |
| 8 | Sewer Upgrades | Sewer | Sewer rehabilitation and I&I | $750K | 2026–2028 |
| 9 | Various Plant Improvements | Water Supply | Wastewater treatment plant upgrades | $700K | 2026–2030 |
| 10 | Sewer Main Lining | Sewer | Sewer rehabilitation and I&I | $600K | 2026–2028 |
3 more line items in Long Beach, with descriptions and contacts
Klarifi holds every Long Beach line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$16M
11 items
2027
$10M
1 items
2028
$4M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $2M | 7% |
| Sewer | 3 | $2M | 5% |
| Water Supply | 7 | $17M | 57% |
| Water Distribution | 2 | $9M | 31% |
1 publicly owned treatment plant in Long Beach with 83 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Long Beach (c) WPCP | 4.53 | NY0020567 | 83 |
Sources and methodology
Budgets and years are as published in Long Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (13 line items).
Data refreshed September 11, 2026.