Bethlehem, New York: water and wastewater capital improvement projects
Water, sewer and wastewater line items in Bethlehem’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $26M
- Line items
- 42
- Wastewater and sewer
- $11M
- Starting
- 2026–2030
- Plan
- 1
Bethlehem's published capital plans list 42 water, sewer and wastewater line items with a combined planning budget of $26M, of which 19 items worth $11M sit in the wastewater and sewer departments. The largest single item is Remaining Tank Work – Kenwood Tank Replacement at $4M (2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Bethlehem
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Remaining Tank Work – Kenwood Tank Replacement | Water Supply | Storage tanks and reservoirs | $4M | 2029 |
| 2 | Clarifier Rehabilitation Recycle PS Improvements; Clearwell improvements. | Water Supply | Clarifiers and settling | $3M | 2025–2027 |
| 3 | Pump Station Replacement and Rehabilitation – Design in 2026, Construction in 2027 | Sewer | Pump stations | $3M | 2026–2029 |
| 4 | Consolidated Field Operations Facility (Sewer Portion) | Sewer | Sewer rehabilitation and I&I | $3M | 2030 |
| 5 | Looping and Replacement of Aging Water Mains (574.24-03) – To Improve Water Quality and Reduce Outages; Delaware Complete Streets Replacement in 2024 | Water Distribution | Water mains and distribution | $2M | 2025–2028 |
| 6 | Backup Generator – Dinmore Road Wellfield (573.23-03) – Deferred 1 Year; Engineering in 2024 | Water Supply | Wells and groundwater | $2M | 2025 |
| 7 | Raw Water Reservoir Dredging | Water Supply | Lagoons and ponds | $2M | 2025 |
| 8 | Lining and Rehabilitation of Sewers (572.24-04) – Including Root Control | Sewer | Sewer rehabilitation and I&I | $1M | 2025–2029 |
| 9 | Sludge Blower Replacement | Wastewater | Biosolids, sludge and dewatering | $1M | 2026 |
| 10 | Force Main Replacement and Rehabilitation (572.24-04) | Sewer | Force mains and interceptors | $750K | 2025–2029 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 8 | $3M | 11% |
| Sewer | 11 | $8M | 33% |
| Water Supply | 19 | $12M | 47% |
| Water Distribution | 4 | $2M | 9% |
Project types in Bethlehem's plan
- Clarifiers and settling2 line items$4M
- Sewer rehabilitation and I&I3 line items$4M
- Storage tanks and reservoirs2 line items$4M
- Pump stations4 line items$3M
- Water mains and distribution1 line items$2M
- Wells and groundwater2 line items$2M
- Lagoons and ponds2 line items$2M
- Aeration and blowers3 line items$1M
Wastewater treatment plants in Bethlehem
1 publicly owned treatment plant in Bethlehem with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| South Albany Sd | 0.0018 | NY0191825 | 7 |
Other New York cities with capital plans
- $309M
- $79M
- $76M
- $30M
- $23M
- $18M
- $11M
- $6M
Bethlehem capital plan questions
How much is Bethlehem, NY planning to spend on water and sewer infrastructure?
Bethlehem’s published capital plans list 42 water, sewer and wastewater line items with a combined budget of $26M, of which $11M is in the wastewater and sewer departments.
What is the largest capital project in Bethlehem’s plan?
Remaining Tank Work – Kenwood Tank Replacement, budgeted at $4M and scheduled for 2029 under the Water Supply department.
When do Bethlehem’s water and sewer projects start?
4 projects ($4M) start in 2026 and 1 projects ($35K) start in 2027. Budgets are as published in the plan and can change at adoption.
How do I find the contacts and full project list for Bethlehem?
Klarifi holds every line item with its description, page reference and source document. The public page shows the ten largest items; the full list is available with a free trial.
Try Klarifi for free
Create your own trial account and explore how Klarifi can help you.