Plattsburgh, New York: water and wastewater capital improvement projects

29 line items · $79M · starting 2026–2029 · 1 plan

Plattsburgh's published capital plans list 29 water, sewer and wastewater line items with a combined planning budget of $79M, of which 10 items worth $20M sit in the wastewater and sewer departments. The largest single item is Mead Dam Improvement Construction at $20M (2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Plattsburgh

The 10 largest water, sewer and wastewater line items in Plattsburgh’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Mead Dam Improvement ConstructionWater Distribution$20M2029
2Raw Transmission Line ReplacementsWater DistributionWater mains and distribution$9M2025–2029
3Aeration System UpgradesWastewaterAeration and blowers$8M2027
4Production Well No. 2Water SupplyWells and groundwater$8M2025
5Ground Water SupplyWater Distribution$7M2025–2028
6WRRF Architectural and Stability EnhacementsWastewaterWastewater treatment plant upgrades$6M2025
7Westbrook 1 and 2 Dam Improvement ConstructionWater Supply$5M2025–2027
8Plant ImprovementsWater SupplyWastewater treatment plant upgrades$3M2025–2029
9Commemoration Footbridge CSOSewerStormwater and flood resilience$3M2025
10Hauled Waste Receiving/SeptageWater Distribution$2M2025

19 more line items in Plattsburgh, with descriptions and contacts

Klarifi holds every Plattsburgh line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$45M

18 items

2026

$3M

4 items

2027

$11M

4 items

2028

$600K

2 items

2029

$20M

1 items

By department

Line items and planning budgets by department, Plattsburgh.
DepartmentLine itemsBudgetShare
Wastewater3$15M18%
Sewer7$5M6%
Water Supply5$16M21%
Water Distribution14$44M55%

Project types in Plattsburgh's plan

Wastewater treatment plants in Plattsburgh

1 publicly owned treatment plant in Plattsburgh with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Plattsburgh (c) WPCP5.2NY00260181

Other New York cities with capital plans

Plattsburgh capital plan questions

Sources and methodology

Budgets and years are as published in Plattsburgh’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (29 line items).

Data refreshed September 11, 2026.