Klarifi Logo
Try for freeLog in
Klarifi Logo

Apex, North Carolina: water and wastewater capital improvement projects

24 line items · $48M · starting 2026–2031 · 1 plan

Apex's published capital plans list 24 water, sewer and wastewater line items with a combined planning budget of $48M, of which 5 items worth $5M sit in the wastewater and sewer departments. The largest single item is Elevated Water Storage Tank #5 at $13M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Apex

The 10 largest water, sewer and wastewater line items in Apex’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Elevated Water Storage Tank #5Water SupplyStorage tanks and reservoirs$13M2026–2030
2Old Raleigh Road Water Line ReplacementWater DistributionWater mains and distribution$5M2027–2028
3Waterline Gaps (US 64/Salem)Water DistributionWater mains and distribution$5M2027–2031
4U-5825: Ten-Ten Road Widening Utility RelocationWater DistributionForce mains and interceptors$4M2031
5U-5301: US 64 Corridor Improvements Utility RelocationWater DistributionDisinfection and UV$4M2029–2031
6U-2901B: NC 55 North Widening Utility RelocationWater DistributionSewer rehabilitation and I&I$2M2031
7US 64 & New Hill Olive Chapel Water Line LoopWater DistributionWater mains and distribution$2M2026–2027
8HL-0007: NC 55 Intersection Improvements Utility RelocationSewerSewer rehabilitation and I&I$2M2026–2028
9SCADA System UpgradesWastewaterSCADA, controls and instrumentation$2M2026–2028
10UV System ReplacementWater SupplyDisinfection and UV$2M2025–2026

14 more line items in Apex, with descriptions and contacts

Klarifi holds every Apex line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$5M

6 items

2026

$20M

7 items

2027

$11M

4 items

2028

$1M

1 items

2029

$5M

4 items

2031

$6M

2 items

By department

Line items and planning budgets by department, Apex.
DepartmentLine itemsBudgetShare
Wastewater1$2M3%
Sewer4$3M7%
Water Supply2$14M29%
Water Distribution17$29M61%

Wastewater treatment plants in Apex

2 publicly owned treatment plants in Apex with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Town Of Cary - South Cary WWTP5.1NC00651020
Apex Water Reclamation FacilityNC00640502

Other North Carolina cities with capital plans

Apex capital plan questions

Sources and methodology

Budgets and years are as published in Apex’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (24 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free