Graham, North Carolina: water and wastewater capital improvement projects

76 line items · $68M · starting 2026–2031 · 1 plan

Graham's published capital plans list 76 water, sewer and wastewater line items with a combined planning budget of $68M, of which 37 items worth $18M sit in the wastewater and sewer departments. The largest single item is Water Treatment Plant Upgrade at $18M (2029–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Graham

The 10 largest water, sewer and wastewater line items in Graham’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Treatment Plant UpgradeWater SupplyWastewater treatment plant upgrades$18M2029–2030
2Elevated Storage TankWater SupplyStorage tanks and reservoirs$5M2030–2031
3Neighborhood Waterline Enhancement ProgramWater DistributionWater mains and distribution$4M2030–2035
4Neighorhood Water Enhancement ProgramWater Distribution$4M2025–2030
5Cooper Rd. HR Lift Station Upgrade/RelocationSewerLift stations$4M2026–2027
6Smali Waterline Replacements (CDBG)Water DistributionWater mains and distribution$3M2026–2027
7Harden St. 16" TL ConnectionWater Distribution$3M2030–2031
8Haw River Sewer Outfall and Manhole Rehab (NCDEQ)SewerForce mains and interceptors$3M2026–2027
9Class A BiosolidsWastewaterBiosolids, sludge and dewatering$2M2026–2027
10Hanover Rd Sewer RehabSewerSewer rehabilitation and I&I$2M2027–2028

66 more line items in Graham, with descriptions and contacts

Klarifi holds every Graham line item with its description, the page it appears on and the source document, plus 20 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$8M

12 items

2026

$13M

14 items

2027

$6M

15 items

2028

$7M

8 items

2029

$20M

6 items

2030

$12M

10 items

2031

$2M

6 items

2032 and later

$375K

5 items

By department

Line items and planning budgets by department, Graham.
DepartmentLine itemsBudgetShare
Wastewater23$4M5%
Sewer14$15M22%
Water Supply22$27M40%
Water Distribution17$22M33%

Project types in Graham's plan

Wastewater treatment plants in Graham

1 publicly owned treatment plant in Graham with 10 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Graham WWTP City Of1.9NC002121110

Other North Carolina cities with capital plans

Graham capital plan questions

Sources and methodology

Budgets and years are as published in Graham’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (76 line items).

Data refreshed September 11, 2026.