13 line items · $6M · starting 2026–2027 · 1 plan
Tarboro's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $6M, of which 8 items worth $4M sit in the wastewater and sewer departments. The largest single item is Anaerobic Selector/Anoxic Tanks at $2M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Anaerobic Selector/Anoxic Tanks | Wastewater | Nutrient removal | $2M | 2026–2027 |
| 2 | Water Storage Tank - Rehab | Water Supply | Storage tanks and reservoirs | $825K | 2025–2029 |
| 3 | Sewer Line Rehab | Sewer | Sewer rehabilitation and I&I | $725K | 2025–2031 |
| 4 | Jet-Vac | Sewer | Vehicles and equipment | $500K | 2026–2027 |
| 5 | Mud Valve Replacement | Wastewater | Water mains and distribution | $500K | 2025–2029 |
| 6 | Backhoe 4x4 | Water Distribution | Vehicles and equipment | $300K | 2025–2030 |
| 7 | Service Truck | Water Distribution | Vehicles and equipment | $265K | 2025–2030 |
| 8 | New Pump for Office St. Lift Station | Sewer | Pump stations | $260K | 2026–2029 |
| 9 | Mini Excavator | Water Distribution | Vehicles and equipment | $140K | 2026–2031 |
| 10 | Clarifier | Wastewater | Clarifiers and settling | $125K | 2025–2026 |
3 more line items in Tarboro, with descriptions and contacts
Klarifi holds every Tarboro line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$3M
6 items
2026
$3M
6 items
2027
$120K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $3M | 49% |
| Sewer | 3 | $1M | 24% |
| Water Supply | 1 | $825K | 14% |
| Water Distribution | 4 | $805K | 13% |
1 publicly owned treatment plant in Tarboro. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Tarboro WWTP | 1.35 | NC0020605 | 0 |
Sources and methodology
Budgets and years are as published in Tarboro’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2031 (13 line items).
Data refreshed September 11, 2026.