34 planned projects · $48M · 2 cities · 2 plans
The 2 capital improvement plans and adopted budgets Klarifi has extracted for Vermont list 34 water, sewer and wastewater line items with a combined planning budget of $48M across 2 cities. South Burlington has the largest plan at $48M. Each city page lists its largest projects with budgets and years, links the source document and the city's treatment plants.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | City | Line items | Budget | Plans |
|---|---|---|---|---|
| 1 | South Burlington | 33 | $48M | 1 |
2026
$39M
19 items
2027
$4M
5 items
2028
$2M
3 items
2029
$1M
2 items
2031
$352K
2 items
2032 and later
$250K
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 12 | $25M | 52% |
| Sewer | 11 | $13M | 27% |
| Water Supply | 2 | $4M | 7% |
| Water Distribution | 9 | $6M | 13% |
| # | Project | City | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Bartlett Bay 2025 Upgrade | South Burlington, VT | Wastewater treatment plant upgrades | $13M | 2026–2035 |
| 2 | Airport Parkway 2011 Upgrade | South Burlington, VT | Wastewater treatment plant upgrades | $8M | 2026–2033 |
| 3 | High Service Storage Tank | South Burlington, VT | Storage tanks and reservoirs | $4M | 2026–2035 |
| 4 | Queen City Park Pump Stations | South Burlington, VT | Pump stations | $3M | 2026–2035 |
| 5 | Pump Station Refurbishment | South Burlington, VT | Pump stations | $3M | 2026–2035 |
| 6 | Valve and Hydrant Replacement Pre-Paving | South Burlington, VT | Water mains and distribution | $2M | 2027–2035 |
| 7 | Hinesburg Road Pump Station | South Burlington, VT | Pump stations | $2M | 2028–2035 |
| 8 | Fleet | South Burlington, VT | Vehicles and equipment | $1M | 2026–2033 |
| 9 | Airport Parkway Solids Handling | South Burlington, VT | Biosolids, sludge and dewatering | $1M | 2026–2035 |
| 10 | South Spear Street Water Line | South Burlington, VT | Water mains and distribution | $1M | 2027–2035 |
All 34 Vermont line items in Klarifi
Every project with its description, page reference and source document, filterable by city, department, type, budget and year, linked to the plants and decision-makers in each city.
Sources and methodology
Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Data refreshed September 11, 2026.