Vermont water and wastewater capital improvement plans

34 planned projects · $48M · 2 cities · 2 plans

The 2 capital improvement plans and adopted budgets Klarifi has extracted for Vermont list 34 water, sewer and wastewater line items with a combined planning budget of $48M across 2 cities. South Burlington has the largest plan at $48M. Each city page lists its largest projects with budgets and years, links the source document and the city's treatment plants.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

Wastewater plants in VermontVermont NPDES permits →

Cities in Vermont with water and sewer capital plans

Vermont cities ranked by the combined planning budget of their water, sewer and wastewater line items.
#CityLine itemsBudgetPlans
1South Burlington33$48M1

Planned spend by start year

2026

$39M

19 items

2027

$4M

5 items

2028

$2M

3 items

2029

$1M

2 items

2031

$352K

2 items

2032 and later

$250K

3 items

By department

Line items and planning budgets by utility department, Vermont.
DepartmentLine itemsBudgetShare
Wastewater12$25M52%
Sewer11$13M27%
Water Supply2$4M7%
Water Distribution9$6M13%

Project types in Vermont

Wastewater treatment plant upgrades · 4 · $21MPump stations · 7 · $11MWater mains and distribution · 6 · $5MStorage tanks and reservoirs · 1 · $4MForce mains and interceptors · 4 · $3MBiosolids, sludge and dewatering · 1 · $1MMeters and AMI · 1 · $820KDisinfection and UV · 1 · $300KLead service line replacement · 1 · $190KAnaerobic digesters and biogas · 1 · $100K

The largest planned projects in Vermont

The ten largest water, sewer and wastewater line items in Vermont plans by planning budget.
#ProjectCityTypeBudgetYears
1Bartlett Bay 2025 UpgradeSouth Burlington, VTWastewater treatment plant upgrades$13M2026–2035
2Airport Parkway 2011 UpgradeSouth Burlington, VTWastewater treatment plant upgrades$8M2026–2033
3High Service Storage TankSouth Burlington, VTStorage tanks and reservoirs$4M2026–2035
4Queen City Park Pump StationsSouth Burlington, VTPump stations$3M2026–2035
5Pump Station RefurbishmentSouth Burlington, VTPump stations$3M2026–2035
6Valve and Hydrant Replacement Pre-PavingSouth Burlington, VTWater mains and distribution$2M2027–2035
7Hinesburg Road Pump StationSouth Burlington, VTPump stations$2M2028–2035
8FleetSouth Burlington, VTVehicles and equipment$1M2026–2033
9Airport Parkway Solids HandlingSouth Burlington, VTBiosolids, sludge and dewatering$1M2026–2035
10South Spear Street Water LineSouth Burlington, VTWater mains and distribution$1M2027–2035

All 34 Vermont line items in Klarifi

Every project with its description, page reference and source document, filterable by city, department, type, budget and year, linked to the plants and decision-makers in each city.

Start a free trial

Vermont capital plan questions

Sources and methodology

Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Data refreshed September 11, 2026.