Salem, Virginia: water and wastewater capital improvement projects

28 line items · $59M · starting 2026–2029 · 1 plan

Salem's published capital plans list 28 water, sewer and wastewater line items with a combined planning budget of $59M, of which 8 items worth $25M sit in the wastewater and sewer departments. The largest single item is Mason Creek Interceptor Upgrade Construction at $10M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Salem

The 10 largest water, sewer and wastewater line items in Salem’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Mason Creek Interceptor Upgrade ConstructionSewerForce mains and interceptors$10M2026
2Waterline Design and ReplacementWater DistributionWater mains and distribution$9M2026–2030
3Mason Creek SSES Engineering EvaluationSewerPlanning, studies and asset management$8M2027–2029
4Relocate Field Operations to Tidewater Street (Sewer)SewerBiosolids, sludge and dewatering$5M2029–2030
5Relocate Field Operations to Tidewater Street (Water)Water SupplyBiosolids, sludge and dewatering$5M2029–2030
6North Salem Water System Improvements - Phase IIWater DistributionWater mains and distribution$4M2027
7North Salem Water System Improvements - Phase IIIWater DistributionWater mains and distribution$4M2028
8North Salem Water System Improvements - Phase IVWater DistributionWater mains and distribution$3M2029
9Storage Tank Replacements - Red LaneWater SupplyStorage tanks and reservoirs$2M2027
10North Salem Water System Improvements - Phase IWater DistributionWater mains and distribution$1M2026

18 more line items in Salem, with descriptions and contacts

Klarifi holds every Salem line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$24M

10 items

2027

$19M

12 items

2028

$4M

3 items

2029

$12M

3 items

By department

Line items and planning budgets by department, Salem.
DepartmentLine itemsBudgetShare
Sewer8$25M43%
Water Supply11$11M18%
Water Distribution9$23M39%

Project types in Salem's plan

Wastewater treatment plants in Salem

No publicly owned treatment plant is recorded under Salem in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Virginia.

Other Virginia cities with capital plans

Salem capital plan questions

Sources and methodology

Budgets and years are as published in Salem’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2031 (28 line items).

Data refreshed September 11, 2026.