22 line items · $19M · starting 2026 · 1 plan
Canton's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $19M, of which 13 items worth $10M sit in the wastewater and sewer departments. The largest single item is Plant Expansion at $9M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Plant Expansion | Wastewater | Wastewater treatment plant upgrades | $9M | 2026 |
| 2 | Ridge Pine Elevated Water Tank | Water Distribution | Storage tanks and reservoirs | $8M | 2026 |
| 3 | 1575 Water Main Extension | Water Distribution | Water mains and distribution | $752K | 2026 |
| 4 | Odor Control at Great Sky | Sewer | Odor and corrosion control | $600K | 2026 |
| 5 | Plant Upgrade | Water Supply | — | $250K | 2026 |
| 6 | Wastewater Master Plan Update | Wastewater | Planning, studies and asset management | $250K | 2026 |
| 7 | Water Master Plan Update | Water Distribution | Planning, studies and asset management | $243K | 2026 |
| 8 | River Green 8 Generator | Sewer | Generators, power and electrical | $173K | 2026 |
| 9 | Skid Steer Replacement | Wastewater | Vehicles and equipment | $75K | 2026 |
| 10 | Robot Camera System | Sewer | Vehicles and equipment | $70K | 2026 |
12 more line items in Canton, with descriptions and contacts
Klarifi holds every Canton line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$19M
22 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 6 | $10M | 49% |
| Sewer | 7 | $913K | 5% |
| Water Supply | 1 | $250K | 1% |
| Water Distribution | 8 | $9M | 45% |
1 publicly owned treatment plant in Canton with 89 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Canton, City Of (canton Wpcp) | 2.62 | GA0025674 | 89 |
Sources and methodology
Budgets and years are as published in Canton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026 (22 line items).
Data refreshed September 11, 2026.