Canton, Georgia: water and wastewater capital improvement projects

22 line items · $19M · starting 2026 · 1 plan

Canton's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $19M, of which 13 items worth $10M sit in the wastewater and sewer departments. The largest single item is Plant Expansion at $9M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Canton

The 10 largest water, sewer and wastewater line items in Canton’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Plant ExpansionWastewaterWastewater treatment plant upgrades$9M2026
2Ridge Pine Elevated Water TankWater DistributionStorage tanks and reservoirs$8M2026
31575 Water Main ExtensionWater DistributionWater mains and distribution$752K2026
4Odor Control at Great SkySewerOdor and corrosion control$600K2026
5Plant UpgradeWater Supply$250K2026
6Wastewater Master Plan UpdateWastewaterPlanning, studies and asset management$250K2026
7Water Master Plan UpdateWater DistributionPlanning, studies and asset management$243K2026
8River Green 8 GeneratorSewerGenerators, power and electrical$173K2026
9Skid Steer ReplacementWastewaterVehicles and equipment$75K2026
10Robot Camera SystemSewerVehicles and equipment$70K2026

12 more line items in Canton, with descriptions and contacts

Klarifi holds every Canton line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$19M

22 items

By department

Line items and planning budgets by department, Canton.
DepartmentLine itemsBudgetShare
Wastewater6$10M49%
Sewer7$913K5%
Water Supply1$250K1%
Water Distribution8$9M45%

Project types in Canton's plan

Wastewater treatment plants in Canton

1 publicly owned treatment plant in Canton with 89 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Canton, City Of (canton Wpcp)2.62GA002567489

Other Georgia cities with capital plans

Canton capital plan questions

Sources and methodology

Budgets and years are as published in Canton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026 (22 line items).

Data refreshed September 11, 2026.