Stockbridge, Georgia: water and wastewater capital improvement projects

Water, sewer and wastewater line items in Stockbridge’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.

Planned budget
$17M
Line items
4
Wastewater and sewer
$15M
2 line items
Starting
2026–2027
Plan
1

Stockbridge's published capital plans list 4 water, sewer and wastewater line items with a combined planning budget of $17M, of which 2 items worth $15M sit in the wastewater and sewer departments. The largest single item is Clay Pipe Replacement at $13M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Stockbridge

The 4 largest water, sewer and wastewater line items in Stockbridge’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Clay Pipe ReplacementSewerWater mains and distribution$13M2025–2028
2Northbridge Station Sanitary Sewer RehabilitationSewerSewer rehabilitation and I&I$2M2027
3SR 138/142 Utility Relocation GDOTWater Supply—$735K2026
4Water Service Line ReplacementWater DistributionWater mains and distribution$655K2025
Descriptions, page references and contacts for Stockbridge
Klarifi holds every Stockbridge line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Create a free account

Planned spend by start year

Before 2026
$14M
2 items
2026
$735K
1 items
2027
$2M
1 items

By department

Line items and planning budgets by department, Stockbridge.
DepartmentLine itemsBudgetShare
Sewer2$15M92%
Water Supply1$735K4%
Water Distribution1$655K4%

Project types in Stockbridge's plan

  • Water mains and distribution
    2 line items
    $14M
  • $2M

Wastewater treatment plants in Stockbridge

1 publicly owned treatment plant in Stockbridge with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Stockbridge, City Of (stephen D. Peurifoy Wpcp)—GA00233373

Other Georgia cities with capital plans

All Georgia plans

Stockbridge capital plan questions

  1. How much is Stockbridge, GA planning to spend on water and sewer infrastructure?

    Stockbridge’s published capital plans list 4 water, sewer and wastewater line items with a combined budget of $17M, of which $15M is in the wastewater and sewer departments.

  2. What is the largest capital project in Stockbridge’s plan?

    Clay Pipe Replacement, budgeted at $13M and scheduled for 2025–2028 under the Sewer department.

  3. When do Stockbridge’s water and sewer projects start?

    1 projects ($735K) start in 2026 and 1 projects ($2M) start in 2027. Budgets are as published in the plan and can change at adoption.

  4. How do I find the contacts and full project list for Stockbridge?

    Klarifi holds every line item with its description, page reference and source document, plus 1 verified contact at the city’s treatment plants. The public page shows the ten largest items; the full list is available with a free trial.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for freeOr book a demo
Wastewater market intelligence: facilities, permits, compliance and capital projects for North America and Europe.
© 2026 Klarifi ApS, Diplomvej 381, 2800 Kgs. Lyngby, Denmark
Public data refreshed Nov 2, 2026