4 line items · $17M · starting 2026–2027 · 1 plan
Stockbridge's published capital plans list 4 water, sewer and wastewater line items with a combined planning budget of $17M, of which 2 items worth $15M sit in the wastewater and sewer departments. The largest single item is Clay Pipe Replacement at $13M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Clay Pipe Replacement | Sewer | Water mains and distribution | $13M | 2025–2028 |
| 2 | Northbridge Station Sanitary Sewer Rehabilitation | Sewer | Sewer rehabilitation and I&I | $2M | 2027 |
| 3 | SR 138/142 Utility Relocation GDOT | Water Supply | — | $735K | 2026 |
| 4 | Water Service Line Replacement | Water Distribution | Water mains and distribution | $655K | 2025 |
Descriptions, page references and contacts for Stockbridge
Klarifi holds every Stockbridge line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$14M
2 items
2026
$735K
1 items
2027
$2M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 2 | $15M | 92% |
| Water Supply | 1 | $735K | 4% |
| Water Distribution | 1 | $655K | 4% |
1 publicly owned treatment plant in Stockbridge with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Stockbridge, City Of (stephen D. Peurifoy Wpcp) | — | GA0023337 | 3 |
Sources and methodology
Budgets and years are as published in Stockbridge’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2028 (4 line items).