24 line items · $25M · 1 plan
Gainesville's published capital plans list 24 water, sewer and wastewater line items with a combined planning budget of $25M, of which 13 items worth $10M sit in the wastewater and sewer departments. The largest single item is Sardis Road Connector Utilities Relocation at $5M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sardis Road Connector Utilities Relocation | Water Distribution | Sewer rehabilitation and I&I | $5M | 2025 |
| 2 | FY25 New Water Meter Installations | Water Supply | Meters and AMI | $3M | 2025 |
| 3 | FY22 Sanitary Sewer System Improvements | Sewer | Sewer rehabilitation and I&I | $3M | 2025 |
| 4 | Lift Station Improvements | Wastewater | Lift stations | $3M | 2025 |
| 5 | Green Street Widening | Water Distribution | Sewer rehabilitation and I&I | $2M | 2025 |
| 6 | FY23 WTP Improvements | Water Supply | Water treatment plants | $2M | 2025 |
| 7 | Rilla Road Booster Pump Station Improvements | Water Distribution | Pump stations | $1M | 2025 |
| 8 | FY25 Water Reclamation Facility Projects | Wastewater | Wastewater treatment plant upgrades | $1M | 2025 |
| 9 | Meter Maintenance Program | Water Supply | Meters and AMI | $1M | 2025 |
| 10 | Utility Billing Software | Wastewater | Vehicles and equipment | $1M | 2025 |
14 more line items in Gainesville, with descriptions and contacts
Klarifi holds every Gainesville line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$25M
24 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 12 | $8M | 30% |
| Sewer | 1 | $3M | 10% |
| Water Supply | 6 | $6M | 25% |
| Water Distribution | 5 | $9M | 35% |
1 publicly owned treatment plant in Gainesville with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Gainesville Linwood WWTP | 2.69 | GA0020168 | 3 |
Sources and methodology
Budgets and years are as published in Gainesville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (24 line items).
Data refreshed September 11, 2026.