22 line items · $62M · starting 2026 · 1 plan

Braselton's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $62M, of which 15 items worth $50M sit in the wastewater and sewer departments. The largest single item is WRF Expansion and Upgrade at $35M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Braselton

The 10 largest water, sewer and wastewater line items in Braselton’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WRF Expansion and UpgradeWastewaterWastewater treatment plant upgrades$35M2025–2027
2SR124 Water Transmission Main with Booster Pump (1 MGD)Water SupplyPump stations$7M2026–2028
3Evaluate & Upgrade Reflections and Clearwater Pumping FacilitiesSewer$5M2025–2027
4Industrial Park PS Replacement/UpgradeSewer$5M2025
5Mulberry River Streambank Stabilization Phase IISewer$3M2026–2027
6Groundwater Development - Two Identified Wells on Charlie SmithWater SupplyWells and groundwater$3M2025–2026
7Plant Riverbank StabilizationWater Supply$1M2025–2026
8Reuse Distribution Inside Chateau ElanSewerWater mains and distribution$800K2026–2028
9Water/Sewer Service Vehicles (New & Replacement)SewerSewer rehabilitation and I&I$600K2025–2029
10Generator Upgrades/ReplacementsSewerGenerators, power and electrical$250K2025–2029

12 more line items in Braselton, with descriptions and contacts

Klarifi holds every Braselton line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$50M

18 items

2026

$11M

4 items

By department

Line items and planning budgets by department, Braselton.
DepartmentLine itemsBudgetShare
Wastewater7$35M57%
Sewer8$15M24%
Water Supply4$11M18%
Water Distribution3$505K1%

Project types in Braselton's plan

Wastewater treatment plants in Braselton

1 publicly owned treatment plant in Braselton with 21 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Braselton, Town Of (braselton Wrf)1.12GA003885721

Other Georgia cities with capital plans

Braselton capital plan questions

Sources and methodology

Budgets and years are as published in Braselton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (22 line items).

Data refreshed September 11, 2026.