22 line items · $62M · starting 2026 · 1 plan
Braselton's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $62M, of which 15 items worth $50M sit in the wastewater and sewer departments. The largest single item is WRF Expansion and Upgrade at $35M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | WRF Expansion and Upgrade | Wastewater | Wastewater treatment plant upgrades | $35M | 2025–2027 |
| 2 | SR124 Water Transmission Main with Booster Pump (1 MGD) | Water Supply | Pump stations | $7M | 2026–2028 |
| 3 | Evaluate & Upgrade Reflections and Clearwater Pumping Facilities | Sewer | — | $5M | 2025–2027 |
| 4 | Industrial Park PS Replacement/Upgrade | Sewer | — | $5M | 2025 |
| 5 | Mulberry River Streambank Stabilization Phase II | Sewer | — | $3M | 2026–2027 |
| 6 | Groundwater Development - Two Identified Wells on Charlie Smith | Water Supply | Wells and groundwater | $3M | 2025–2026 |
| 7 | Plant Riverbank Stabilization | Water Supply | — | $1M | 2025–2026 |
| 8 | Reuse Distribution Inside Chateau Elan | Sewer | Water mains and distribution | $800K | 2026–2028 |
| 9 | Water/Sewer Service Vehicles (New & Replacement) | Sewer | Sewer rehabilitation and I&I | $600K | 2025–2029 |
| 10 | Generator Upgrades/Replacements | Sewer | Generators, power and electrical | $250K | 2025–2029 |
12 more line items in Braselton, with descriptions and contacts
Klarifi holds every Braselton line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$50M
18 items
2026
$11M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $35M | 57% |
| Sewer | 8 | $15M | 24% |
| Water Supply | 4 | $11M | 18% |
| Water Distribution | 3 | $505K | 1% |
1 publicly owned treatment plant in Braselton with 21 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Braselton, Town Of (braselton Wrf) | 1.12 | GA0038857 | 21 |
Sources and methodology
Budgets and years are as published in Braselton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (22 line items).
Data refreshed September 11, 2026.