Columbus, Georgia: water and wastewater capital improvement projects

13 line items · $18M · 1 plan

Columbus's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $18M, of which 13 items worth $18M sit in the wastewater and sewer departments. The largest single item is 19th St Flood Abatement at $9M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Columbus

The 10 largest water, sewer and wastewater line items in Columbus’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
119th St Flood AbatementSewerStormwater and flood resilience$9M2025
2LOST StormwaterSewerStormwater and flood resilience$5M2025
3Front Ave Combined Sewer SystemSewerSewer rehabilitation and I&I$1M2025
4Cherokee Retaining WallSewerBuildings, HVAC and site work$1M2025
5Pipe RehabilitationSewerSewer rehabilitation and I&I$755K2025
6Armour Road Flood RemediationSewerStormwater and flood resilience$400K2025
7Buena Vista Road DrainageSewerStormwater and flood resilience$400K2025
8CCG Owned Lift Stations RehabSewerLift stations$135K2025
9Light Pole 88 Riverbank Slope RepairSewer$78K2025
10Fleet Management/EPASewerVehicles and equipment$55K2025

3 more line items in Columbus, with descriptions and contacts

Klarifi holds every Columbus line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$18M

13 items

By department

Line items and planning budgets by department, Columbus.
DepartmentLine itemsBudgetShare
Sewer13$18M100%

Wastewater treatment plants in Columbus

1 publicly owned treatment plant in Columbus with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
South Columbus Water Resource Facility27.02GA00205162

Other Georgia cities with capital plans

Columbus capital plan questions

Sources and methodology

Budgets and years are as published in Columbus’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2025 (13 line items).

Data refreshed September 11, 2026.