Bartlett, Illinois: water and wastewater capital improvement projects

12 line items · $38M · 1 plan

Bartlett's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $38M, of which 5 items worth $19M sit in the wastewater and sewer departments. The largest single item is Infrastructure Improvements with Water Transition at $6M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Bartlett

The 10 largest water, sewer and wastewater line items in Bartlett’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Infrastructure Improvements with Water TransitionWater Supply$6M2025–2028
2Water Main ReplacementWater DistributionWater mains and distribution$5M2024–2029
3Lift Station Upgrades and RehabilitationSewerLift stations$5M2024–2029
4Devon Excess Flow Plant RehabilitationSewerLift stations$5M2024–2025
5Water Meter ChangeoutWater DistributionMeters and AMI$5M2024–2027
6Bittersweet WWTP Facility Plan ImprovementsWastewaterWastewater treatment plant upgrades$4M2024–2025
7Bittersweet WRF RehabilitationWastewaterWastewater treatment plant upgrades$4M2024–2029
8Water Tower PaintingWater SupplyStorage tanks and reservoirs$2M2024–2026
9Sanitary Sewer System RehabilitationSewerSewer rehabilitation and I&I$1M2024–2025
10Watermain Leak Survey and Leak RepairsWater DistributionWater mains and distribution$625K2024–2029

2 more line items in Bartlett, with descriptions and contacts

Klarifi holds every Bartlett line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$38M

12 items

By department

Line items and planning budgets by department, Bartlett.
DepartmentLine itemsBudgetShare
Wastewater2$9M22%
Sewer3$10M27%
Water Supply3$9M22%
Water Distribution4$11M28%

Wastewater treatment plants in Bartlett

1 publicly owned treatment plant in Bartlett with 6 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Bartlett Stp, Village Of1.7ILL0276186

Other Illinois cities with capital plans

Bartlett capital plan questions

Sources and methodology

Budgets and years are as published in Bartlett’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (12 line items).

Data refreshed September 11, 2026.