12 line items · $38M · 1 plan
Bartlett's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $38M, of which 5 items worth $19M sit in the wastewater and sewer departments. The largest single item is Infrastructure Improvements with Water Transition at $6M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Infrastructure Improvements with Water Transition | Water Supply | — | $6M | 2025–2028 |
| 2 | Water Main Replacement | Water Distribution | Water mains and distribution | $5M | 2024–2029 |
| 3 | Lift Station Upgrades and Rehabilitation | Sewer | Lift stations | $5M | 2024–2029 |
| 4 | Devon Excess Flow Plant Rehabilitation | Sewer | Lift stations | $5M | 2024–2025 |
| 5 | Water Meter Changeout | Water Distribution | Meters and AMI | $5M | 2024–2027 |
| 6 | Bittersweet WWTP Facility Plan Improvements | Wastewater | Wastewater treatment plant upgrades | $4M | 2024–2025 |
| 7 | Bittersweet WRF Rehabilitation | Wastewater | Wastewater treatment plant upgrades | $4M | 2024–2029 |
| 8 | Water Tower Painting | Water Supply | Storage tanks and reservoirs | $2M | 2024–2026 |
| 9 | Sanitary Sewer System Rehabilitation | Sewer | Sewer rehabilitation and I&I | $1M | 2024–2025 |
| 10 | Watermain Leak Survey and Leak Repairs | Water Distribution | Water mains and distribution | $625K | 2024–2029 |
2 more line items in Bartlett, with descriptions and contacts
Klarifi holds every Bartlett line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$38M
12 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $9M | 22% |
| Sewer | 3 | $10M | 27% |
| Water Supply | 3 | $9M | 22% |
| Water Distribution | 4 | $11M | 28% |
1 publicly owned treatment plant in Bartlett with 6 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Bartlett Stp, Village Of | 1.7 | ILL027618 | 6 |
Sources and methodology
Budgets and years are as published in Bartlett’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (12 line items).
Data refreshed September 11, 2026.