10 line items · $10M · starting 2026 · 1 plan
Deerfield's published capital plans list 10 water, sewer and wastewater line items with a combined planning budget of $10M, of which 7 items worth $4M sit in the wastewater and sewer departments. The largest single item is Water System Redundancy Project (Northbrook Connection) at $6M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water System Redundancy Project (Northbrook Connection) | Water Distribution | — | $6M | 2025 |
| 2 | Sanitary Sewer Lining | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2028 |
| 3 | Lead Service Line Elimination Program (Combined in 2023) | Water Distribution | Lead service line replacement | $625K | 2025–2028 |
| 4 | Capital Project Locations Sewer Televising & Repairs | Sewer | Sewer rehabilitation and I&I | $375K | 2025–2028 |
| 5 | Deerfield Road Generator Replacement | Wastewater | Generators, power and electrical | $375K | 2025–2026 |
| 6 | Drainage Study and Resolution Program | Sewer | Stormwater and flood resilience | $375K | 2025–2028 |
| 7 | Water System Valving Improvements | Water Distribution | — | $250K | 2025–2028 |
| 8 | Excess Flow Clarifier Tank Repairs | Wastewater | Clarifiers and settling | $125K | 2026 |
| 9 | NARP (Nutrient Assessment Reduction Plan) | Wastewater | Nutrient removal | $100K | 2025–2028 |
| 10 | Inflow and Infiltration - Sump Pump Reduction | Sewer | Membranes and filtration | $25K | 2025–2028 |
Descriptions, page references and contacts for Deerfield
Klarifi holds every Deerfield line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$10M
9 items
2026
$125K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 3 | $600K | 6% |
| Sewer | 4 | $3M | 29% |
| Water Distribution | 3 | $7M | 65% |
1 publicly owned treatment plant in Deerfield with 11 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Deerfield WRF | 1.78 | ILL028347 | 11 |
Sources and methodology
Budgets and years are as published in Deerfield’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2028 (10 line items).
Data refreshed September 11, 2026.