Klarifi Logo
Try for freeLog in
Klarifi Logo

Wauconda, Illinois: water and wastewater capital improvement projects

37 line items · $29M · starting 2026–2027 · 1 plan

Wauconda's published capital plans list 37 water, sewer and wastewater line items with a combined planning budget of $29M, of which 23 items worth $27M sit in the wastewater and sewer departments. The largest single item is WWTP Facilty Activated Sludge Plant Upgrade (Construction) at $18M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Wauconda

The 10 largest water, sewer and wastewater line items in Wauconda’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WWTP Facilty Activated Sludge Plant Upgrade (Construction)WastewaterBiosolids, sludge and dewatering$18M2025–2028
2Sanitary Sewer Lining & Spot RepairsSewerSewer rehabilitation and I&I$2M2024–2028
3Inflow/Infiltration Source DetectionSewerMembranes and filtration$1M2024–2028
4Lift Station No. 4 ImprovementsSewerLift stations$811K2024–2026
5Lift Station 5 ImprovementsSewerLift stations$756K2024–2025
6Water Meter Replacement ProgramWater DistributionMeters and AMI$600K2024–2028
7Lift Station 8SewerLift stations$550K2026–2028
8Lift Station No. 10 ImprovementsSewerLift stations$525K2026–2028
9WWTP Facilty Activated Sludge Plant Upgrade (Engineering)WastewaterBiosolids, sludge and dewatering$500K2024–2025
10SCADA UpgradesWastewaterSCADA, controls and instrumentation$422K2024–2027

27 more line items in Wauconda, with descriptions and contacts

Klarifi holds every Wauconda line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$27M

29 items

2026

$2M

7 items

2027

$300K

1 items

By department

Line items and planning budgets by department, Wauconda.
DepartmentLine itemsBudgetShare
Wastewater6$19M67%
Sewer17$8M27%
Water Supply10$967K3%
Water Distribution4$911K3%

Project types in Wauconda's plan

Wastewater treatment plants in Wauconda

No publicly owned treatment plant is recorded under Wauconda in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Illinois.

Other Illinois cities with capital plans

Wauconda capital plan questions

Sources and methodology

Budgets and years are as published in Wauconda’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2028 (37 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free