21 line items · $8M · starting 2027 · 1 plan
Algonac's published capital plans list 21 water, sewer and wastewater line items with a combined planning budget of $8M, of which 3 items worth $1M sit in the wastewater and sewer departments. The largest single item is Lee St. Replace 4" WM with 8" WM from Dixie North to dead end. 1,810 LF. at $1M (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Lee St. Replace 4" WM with 8" WM from Dixie North to dead end. 1,810 LF. | Water Distribution | — | $1M | 2027–2029 |
| 2 | Lathrup. Replace 6" WM with 8" WM from size transition south to dead end. 1,620LF. | Water Distribution | — | $1M | 2025–2027 |
| 3 | San Sewer Repairs to Pipes, Manholes, Siphons & Pump Stations in priority areas per SAW | Sewer | Pump stations | $750K | 2024–2029 |
| 4 | Michigan St. Replace 4"WM with 8" WM from Mill to North of Maple & Mill St from Washington to M29 | Water Distribution | — | $650K | 2027–2029 |
| 5 | Summer St & Washington. Loop existing 8" WM, possible connection to 12" WM in Washington St. | Water Distribution | — | $650K | 2027–2029 |
| 6 | Fassett St. from Worfolk to Liberty. Replace 4" WM with 8" Design Eng, Construction (66% WF) | Water Distribution | — | $580K | 2027–2029 |
| 7 | Lathrup. Replace 4" WM with 8" WM south from Ruskin. 800LF. | Water Distribution | — | $550K | 2025–2027 |
| 8 | Kenyon. Replace 4" WM with 8"WM to dead end. 710LF. | Water Distribution | — | $490K | 2027–2029 |
| 9 | Edgewater from Conley to north side of bridge. Install new 8" water main 475LF. St. Clair River Drive to Ruskin and Hydrant 28 | Water Distribution | Water mains and distribution | $325K | 2024–2025 |
| 10 | Membranes (360) | Water Supply | Membranes and filtration | $300K | 2027–2028 |
11 more line items in Algonac, with descriptions and contacts
Klarifi holds every Algonac line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$4M
15 items
2027
$4M
6 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 3 | $1M | 13% |
| Water Supply | 7 | $1M | 14% |
| Water Distribution | 11 | $6M | 73% |
1 publicly owned treatment plant in Algonac. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| St Clair County-Algonac WWTP | 1.35 | MI0020389 | 0 |
Sources and methodology
Budgets and years are as published in Algonac’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2024–2025 (21 line items).