38 line items · $3M · starting 2026–2031 · 1 plan
Davison's published capital plans list 38 water, sewer and wastewater line items with a combined planning budget of $3M, of which 9 items worth $1M sit in the wastewater and sewer departments. The largest single item is Sewer Repairs/Lining at $658K (2024–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sewer Repairs/Lining | Sewer | Sewer rehabilitation and I&I | $658K | 2024–2027 |
| 2 | Main Street (Mill to Flint) - Pipeburst | Water Supply | Water mains and distribution | $475K | 2028–2029 |
| 3 | Bay Street Charles to M-15 | Sewer | Sewer rehabilitation and I&I | $400K | 2028–2029 |
| 4 | Annual Hydrant Replacements | Water Supply | Water mains and distribution | $380K | 2024–2032 |
| 5 | Dayton St (Plymouth to Amesbury) | Water Supply | — | $300K | 2028–2029 |
| 6 | Collingwood Cul-de-Sac Upgrades | Water Supply | — | $238K | 2028–2029 |
| 7 | Pump, Piping, and Controls Replacement - 2nd Street #5 | Sewer | Pump stations | $80K | 2031–2032 |
| 8 | Pump, Piping, and Controls Replacement - Flint #8 | Sewer | Pump stations | $80K | 2024–2025 |
| 9 | Pump, Piping, and Controls Replacement- S. Dayton #10 | Sewer | Pump stations | $80K | 2028–2029 |
| 10 | Genesee Street (Rising to Flint) Pipe Repairs/Tied to Streets | Sewer | Sewer rehabilitation and I&I | $75K | 2028–2029 |
28 more line items in Davison, with descriptions and contacts
Klarifi holds every Davison line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$1M
10 items
2026
$7K
1 items
2027
$81K
5 items
2028
$2M
8 items
2029
$35K
2 items
2030
$20K
1 items
2031
$80K
1 items
2032 and later
$285K
10 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 9 | $1M | 43% |
| Water Supply | 29 | $2M | 57% |
No publicly owned treatment plant is recorded under Davison in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Michigan.
Sources and methodology
Budgets and years are as published in Davison’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2022–2028 (38 line items).
Data refreshed September 11, 2026.