Greenville, Michigan: water and wastewater capital improvement projects

53 line items · $34M · starting 2026–2029 · 1 plan

Greenville's published capital plans list 53 water, sewer and wastewater line items with a combined planning budget of $34M, of which 36 items worth $26M sit in the wastewater and sewer departments. The largest single item is WWTP Expansion Phase III at $17M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Greenville

The 10 largest water, sewer and wastewater line items in Greenville’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WWTP Expansion Phase IIIWastewaterWastewater treatment plant upgrades$17M2024–2025
2Dedicated Industrial Trunkline SewerSewerSewer rehabilitation and I&I$4M2027–2028
3Replace Water Service Identified by the Drinking Water Asset Management (DWAM) GrantWater DistributionPlanning, studies and asset management$3M2024–2029
4Sewer and Wastewater (SAW) –Montcalm / Irving Utility ImprovementsSewerSewer rehabilitation and I&I$2M2027–2028
5Radio Frequency Water ReadingWater Supply$1M2024–2029
6Webster Street Water Main and Sewer Separation (SAW)SewerSewer rehabilitation and I&I$975K2025–2026
7Judd Street Water Main ReplacementWater DistributionWater mains and distribution$915K2026–2027
8Sewer and Wastewater (SAW) – 5th Street / Summit Street Utility and RoadSewerSewer rehabilitation and I&I$850K2025–2026
9Sewer and Wastewater (SAW) – Dodge Street Utility ImprovementsSewerSewer rehabilitation and I&I$835K2024–2025
10This will be scheduled maintenance on this well.Water SupplyWells and groundwater$648K2028–2029

43 more line items in Greenville, with descriptions and contacts

Klarifi holds every Greenville line item with its description, the page it appears on and the source document, plus 18 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$24M

30 items

2026

$1M

6 items

2027

$6M

8 items

2028

$1M

4 items

2029

$1M

5 items

By department

Line items and planning budgets by department, Greenville.
DepartmentLine itemsBudgetShare
Wastewater26$18M52%
Sewer10$9M26%
Water Supply8$2M6%
Water Distribution9$5M16%

Project types in Greenville's plan

Wastewater treatment plants in Greenville

1 publicly owned treatment plant in Greenville with 29 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Greenville WWTP1.48MI002039729

Other Michigan cities with capital plans

Greenville capital plan questions

Sources and methodology

Budgets and years are as published in Greenville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2030 (53 line items).

Data refreshed September 11, 2026.