11 line items · $31M · starting 2026 · 1 plan
Holland's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $31M, of which 6 items worth $22M sit in the wastewater and sewer departments. The largest single item is Wastewater Reuse at Pease WWTF at $8M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Wastewater Reuse at Pease WWTF | Wastewater | Wastewater treatment plant upgrades | $8M | 2025–2027 |
| 2 | Peirce Island Wastewater Treatment Facility | Wastewater | Wastewater treatment plant upgrades | $5M | 2025–2027 |
| 3 | Water Storage Tanks Improvements | Water Supply | Storage tanks and reservoirs | $4M | 2025–2027 |
| 4 | Long Term Control Plan Related Projects | Wastewater | Membranes and filtration | $3M | 2026–2028 |
| 5 | Annual Sewer Line Replacement | Sewer | Sewer rehabilitation and I&I | $2M | 2026–2028 |
| 6 | Annual Water Line Replacement | Water Supply | Water mains and distribution | $2M | 2026–2028 |
| 7 | Sewer Service Funding For Sagamore Avenue Area Sewer Extension | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2029 |
| 8 | Wastewater Pumping Station Improvements | Wastewater | Pump stations | $2M | 2025–2029 |
| 9 | Reservoir Management | Water Supply | Storage tanks and reservoirs | $1M | 2026 |
| 10 | Madbury Water Treatment Plant - Facility Repair and Improvements | Water Supply | Water treatment plants | $900K | 2025–2027 |
1 more line items in Holland, with descriptions and contacts
Klarifi holds every Holland line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$22M
6 items
2026
$9M
5 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $18M | 58% |
| Sewer | 2 | $4M | 13% |
| Water Supply | 5 | $9M | 29% |
1 publicly owned treatment plant in Holland. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Holland WWTP | 8.7 | MI0023108 | 0 |
Sources and methodology
Budgets and years are as published in Holland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (11 line items).
Data refreshed September 11, 2026.