11 line items · $7M · starting 2026–2030 · 1 plan
Lakeview's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $7M, of which 5 items worth $3M sit in the wastewater and sewer departments. The largest single item is Pump Replacement and Sewer Bond Project at $3M (2030–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Pump Replacement and Sewer Bond Project | Sewer | Pump stations | $3M | 2030–2031 |
| 2 | Bond Project | Water Supply | Meters and AMI | $3M | 2030–2031 |
| 3 | Sluice Gates/North St. Flow Meter/M-46 Emergency Generator | Sewer | Meters and AMI | $110K | 2025–2026 |
| 4 | Tower Inspection/Paint Inside/Meter and Component Replacement | Water Supply | Meters and AMI | $105K | 2028–2029 |
| 5 | Pump Replacements | Sewer | Pump stations | $87K | 2028–2030 |
| 6 | Lead-Copper Line Replacement | Water Distribution | Meters and AMI | $80K | 2025–2026 |
| 7 | Meter and Component Replacement | Water Distribution | Meters and AMI | $50K | 2026–2027 |
| 8 | Backup Aeration Blower | Sewer | Aeration and blowers | $40K | 2026–2027 |
| 9 | Water Reliability Study | Water Supply | Planning, studies and asset management | $27K | 2027–2028 |
| 10 | Rib Valve Project | Sewer | Water mains and distribution | $15K | 2027–2028 |
1 more line items in Lakeview, with descriptions and contacts
Klarifi holds every Lakeview line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$190K
2 items
2026
$90K
2 items
2027
$42K
2 items
2028
$192K
2 items
2029
$8K
1 items
2030
$6M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 5 | $3M | 50% |
| Water Supply | 4 | $3M | 48% |
| Water Distribution | 2 | $130K | 2% |
1 publicly owned treatment plant in Lakeview with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Lakeview WWTP | — | MI0023388 | 7 |
Sources and methodology
Budgets and years are as published in Lakeview’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025–2026 (11 line items).
Data refreshed September 11, 2026.