32 line items · $11M · starting 2026–2030 · 1 plan
Lapeer's published capital plans list 32 water, sewer and wastewater line items with a combined planning budget of $11M, of which 22 items worth $5M sit in the wastewater and sewer departments. The largest single item is Saginaw St. (RR to Nepessing) at $1M (2029–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Saginaw St. (RR to Nepessing) | Water Distribution | Water mains and distribution | $1M | 2029–2031 |
| 2 | McCormick Lift Station | Wastewater | Lift stations | $1M | 2026–2027 |
| 3 | S. Elm St. (Oak to Saginaw) | Water Distribution | Water mains and distribution | $830K | 2029–2031 |
| 4 | Parkway, Eagle Pass, Oriole, Dove | Water Distribution | Water mains and distribution | $810K | 2027–2029 |
| 5 | Raven & Nightingale | Water Distribution | Water mains and distribution | $620K | 2027–2029 |
| 6 | Oakdale | Water Distribution | Water mains and distribution | $575K | 2030–2031 |
| 7 | Triton Aerators | Wastewater | Aeration and blowers | $570K | 2025–2030 |
| 8 | Sludge Storage Tank Installation | Wastewater | Biosolids, sludge and dewatering | $560K | 2027–2028 |
| 9 | Jefferson, State, Park | Water Distribution | Water mains and distribution | $498K | 2028–2030 |
| 10 | Adams St | Water Distribution | Water mains and distribution | $395K | 2029–2031 |
22 more line items in Lapeer, with descriptions and contacts
Klarifi holds every Lapeer line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
14 items
2026
$2M
7 items
2027
$2M
4 items
2028
$838K
2 items
2029
$3M
4 items
2030
$575K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 22 | $5M | 48% |
| Water Distribution | 10 | $5M | 52% |
2 publicly owned treatment plants in Lapeer with 58 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Lapeer WWTP | 0.78 | MI0020460 | 58 |
| Elba Twp-Lake Nepessing Wwsl | — | MIG580063 | 0 |
Sources and methodology
Budgets and years are as published in Lapeer’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (32 line items).
Data refreshed September 11, 2026.