Klarifi Logo
Try for freeLog in
Klarifi Logo

Lapeer, Michigan: water and wastewater capital improvement projects

32 line items · $11M · starting 2026–2030 · 1 plan

Lapeer's published capital plans list 32 water, sewer and wastewater line items with a combined planning budget of $11M, of which 22 items worth $5M sit in the wastewater and sewer departments. The largest single item is Saginaw St. (RR to Nepessing) at $1M (2029–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Lapeer

The 10 largest water, sewer and wastewater line items in Lapeer’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Saginaw St. (RR to Nepessing)Water DistributionWater mains and distribution$1M2029–2031
2McCormick Lift StationWastewaterLift stations$1M2026–2027
3S. Elm St. (Oak to Saginaw)Water DistributionWater mains and distribution$830K2029–2031
4Parkway, Eagle Pass, Oriole, DoveWater DistributionWater mains and distribution$810K2027–2029
5Raven & NightingaleWater DistributionWater mains and distribution$620K2027–2029
6OakdaleWater DistributionWater mains and distribution$575K2030–2031
7Triton AeratorsWastewaterAeration and blowers$570K2025–2030
8Sludge Storage Tank InstallationWastewaterBiosolids, sludge and dewatering$560K2027–2028
9Jefferson, State, ParkWater DistributionWater mains and distribution$498K2028–2030
10Adams StWater DistributionWater mains and distribution$395K2029–2031

22 more line items in Lapeer, with descriptions and contacts

Klarifi holds every Lapeer line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$2M

14 items

2026

$2M

7 items

2027

$2M

4 items

2028

$838K

2 items

2029

$3M

4 items

2030

$575K

1 items

By department

Line items and planning budgets by department, Lapeer.
DepartmentLine itemsBudgetShare
Wastewater22$5M48%
Water Distribution10$5M52%

Project types in Lapeer's plan

Wastewater treatment plants in Lapeer

2 publicly owned treatment plants in Lapeer with 58 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Lapeer WWTP0.78MI002046058
Elba Twp-Lake Nepessing WwslMIG5800630

Other Michigan cities with capital plans

Lapeer capital plan questions

Sources and methodology

Budgets and years are as published in Lapeer’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2029 (32 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free