Monroe, Michigan: water and wastewater capital improvement projects

24 line items · $40M · 1 plan

Monroe's published capital plans list 24 water, sewer and wastewater line items with a combined planning budget of $40M, of which 11 items worth $14M sit in the wastewater and sewer departments. The largest single item is Water System Repl & Looping at $19M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Monroe

The 10 largest water, sewer and wastewater line items in Monroe’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water System Repl & LoopingWater Supply$19M2024–2025
2Ww System Improvements - SrfWastewater$10M2024–2025
3Miscellaneous/Future Capital ProjectsWater Supply$6M2024–2027
4Future Planned ProjectsWastewater$3M2025–2027
5San Sewer Rehab-Sunset N'Hood-Ph 2 LininSewerSewer rehabilitation and I&I$480K2024–2025
6Water Main-Dixie Dr-N Dixie To DetroitWater DistributionWater mains and distribution$232K2024–2025
7Water Main-E Lorain-Baptiste To Mason RuWater DistributionWater mains and distribution$216K2024–2025
8Wtp-Ozone Generator #1 ReplacementWater SupplyDisinfection and UV$210K2024–2025
9San Sewer Rehab-B/W Roessler/Toll-NnobleSewerSewer rehabilitation and I&I$148K2024–2025
10Excavator ReplacementWater SupplyVehicles and equipment$126K2024–2025

14 more line items in Monroe, with descriptions and contacts

Klarifi holds every Monroe line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$40M

24 items

By department

Line items and planning budgets by department, Monroe.
DepartmentLine itemsBudgetShare
Wastewater4$14M33%
Sewer7$844K2%
Water Supply10$25M63%
Water Distribution3$567K1%

Wastewater treatment plants in Monroe

1 publicly owned treatment plant in Monroe with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Monroe Metro Wastewater Facility8.5MI00284014

Other Michigan cities with capital plans

Monroe capital plan questions

Sources and methodology

Budgets and years are as published in Monroe’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2024–2025 (24 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free