45 line items · $27M · starting 2026–2030 · 1 plan
Sturgis's published capital plans list 45 water, sewer and wastewater line items with a combined planning budget of $27M, of which 24 items worth $13M sit in the wastewater and sewer departments. The largest single item is Plant Capacity Upgrades (add'n 2000# BOD) at $7M (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Plant Capacity Upgrades (add'n 2000# BOD) | Wastewater | — | $7M | 2028–2029 |
| 2 | M66 Utitlities PHASE I - US12-Wade St. | Water Supply | — | $2M | 2025 |
| 3 | New Wellfield | Water Supply | Wells and groundwater | $2M | 2030 |
| 4 | St. Joseph from N. Centerville to Nottawa | Water Supply | — | $2M | 2025 |
| 5 | Lead Service Line Replacement | Water Supply | Lead service line replacement | $2M | 2025–2030 |
| 6 | Michigan St Liftstation Improvements | Wastewater | Lift stations | $2M | 2025 |
| 7 | M66 Utitlities PHASE II - (N) US12 to Lafayette St. | Water Supply | — | $1M | 2027 |
| 8 | E. Hatch from Prospect to Lakeview | Water Supply | — | $1M | 2025–2026 |
| 9 | S. Lakeview (US-12 to Mechanic) | Water Supply | — | $1M | 2026–2027 |
| 10 | Replace IC Screw Pump & Reducer | Wastewater | Pump stations | $700K | 2026 |
35 more line items in Sturgis, with descriptions and contacts
Klarifi holds every Sturgis line item with its description, the page it appears on and the source document, plus 26 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$11M
18 items
2026
$3M
10 items
2027
$2M
7 items
2028
$8M
5 items
2029
$550K
2 items
2030
$2M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 24 | $13M | 47% |
| Water Supply | 21 | $14M | 53% |
1 publicly owned treatment plant in Sturgis with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Sturgis WWTP | 1.13 | MI0020451 | 2 |
Sources and methodology
Budgets and years are as published in Sturgis’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2024–2025 (45 line items).
Data refreshed September 11, 2026.