19 line items · $4M · starting 2026–2028 · 1 plan
Tecumseh's published capital plans list 19 water, sewer and wastewater line items with a combined planning budget of $4M, of which 14 items worth $2M sit in the wastewater and sewer departments. The largest single item is East Russell Road to Rogers Hwy Water Main at $945K (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | East Russell Road to Rogers Hwy Water Main | Water Supply | Water mains and distribution | $945K | 2025–2026 |
| 2 | N. Democratic-N. Van Buren to N. Union Street Water Main Loop | Water Supply | Water mains and distribution | $640K | 2027 |
| 3 | Combination Sewer Jetting & Vacuum Truck | Wastewater | Sewer rehabilitation and I&I | $600K | 2026–2030 |
| 4 | Grade 5 Sewer Defect Repairs Phase 4 | Wastewater | Sewer rehabilitation and I&I | $445K | 2028 |
| 5 | Grade 5 Sewer Defect Repairs Phase 3 | Wastewater | Sewer rehabilitation and I&I | $300K | 2026–2027 |
| 6 | Air-actuated Control Valve Replacement | Wastewater | Water mains and distribution | $200K | 2025 |
| 7 | WWTP Door Replacements | Wastewater | Wastewater treatment plant upgrades | $185K | 2025 |
| 8 | Well 15 Backup Generator | Water Supply | Wells and groundwater | $150K | 2027 |
| 9 | New Pickup/Service Vehicle | Wastewater | Vehicles and equipment | $120K | 2025–2028 |
| 10 | Wastewater Pump Rebuild/Replace | Wastewater | Pump stations | $99K | 2025–2030 |
9 more line items in Tecumseh, with descriptions and contacts
Klarifi holds every Tecumseh line item with its description, the page it appears on and the source document, plus 14 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
12 items
2026
$1M
4 items
2027
$790K
2 items
2028
$445K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 14 | $2M | 55% |
| Water Supply | 5 | $2M | 45% |
1 publicly owned treatment plant in Tecumseh with 67 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Tecumseh WWTP | 0.6 | MI0020583 | 67 |
Sources and methodology
Budgets and years are as published in Tecumseh’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025 (19 line items).
Data refreshed September 11, 2026.