38 line items · $37M · starting 2026–2030 · 1 plan
Troy's published capital plans list 38 water, sewer and wastewater line items with a combined planning budget of $37M, of which 12 items worth $14M sit in the wastewater and sewer departments. The largest single item is Sanitary Sewer CIPP at $5M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sanitary Sewer CIPP | Sewer | Sewer rehabilitation and I&I | $5M | 2025–2030 |
| 2 | Big Beaver – Daley to John R | Water Distribution | Water mains and distribution | $3M | 2027 |
| 3 | Sanitary Cleaning & Television Inspection | Sewer | Sewer rehabilitation and I&I | $3M | 2026–2030 |
| 4 | Bethany Villa – 8" to 12" | Water Distribution | Water mains and distribution | $2M | 2030 |
| 5 | Sec. 19 NE 1/4-6' to 8' | Water Distribution | Water mains and distribution | $2M | 2028 |
| 6 | John R – Brinston to Big Beaver | Water Distribution | Water mains and distribution | $2M | 2026 |
| 7 | Root Treatment | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2030 |
| 8 | Long Lake Plaza Water Main Replacement | Water Distribution | Water mains and distribution | $1M | 2025 |
| 9 | MU Replacement | Water Distribution | Meters and AMI | $1M | 2025–2030 |
| 10 | Finch, Portsmouth to Huntsford | Water Distribution | Water mains and distribution | $1M | 2026 |
28 more line items in Troy, with descriptions and contacts
Klarifi holds every Troy line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$15M
19 items
2026
$7M
5 items
2027
$4M
2 items
2028
$4M
3 items
2029
$3M
5 items
2030
$4M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 12 | $14M | 37% |
| Water Supply | 1 | $100K | 0% |
| Water Distribution | 25 | $23M | 63% |
No publicly owned treatment plant is recorded under Troy in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Michigan.
Sources and methodology
Budgets and years are as published in Troy’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (38 line items).