Wyandotte, Michigan: water and wastewater capital improvement projects

6 line items · $7M · 1 plan

Wyandotte's published capital plans list 6 water, sewer and wastewater line items with a combined planning budget of $7M, of which 1 items worth $2M sit in the wastewater and sewer departments. The largest single item is City Sewer Improvements at $2M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Wyandotte

The 6 largest water, sewer and wastewater line items in Wyandotte’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1City Sewer ImprovementsSewerSewer rehabilitation and I&I$2M2025–2028
2Water Main ReplacementWater DistributionWater mains and distribution$2M2025–2028
3Service Line ReplacementWater DistributionWater mains and distribution$2M2025–2028
4Water Meter ReplacementWater SupplyMeters and AMI$300K2025–2028
5Advanced Metering Infrastructure (AMI)Water DistributionMeters and AMI$200K2025
6Rebuild High/Low Service Pump & MotorWater DistributionPump stations$200K2025–2028

Descriptions, page references and contacts for Wyandotte

Klarifi holds every Wyandotte line item with its description, the page it appears on and the source document, plus 13 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$7M

6 items

By department

Line items and planning budgets by department, Wyandotte.
DepartmentLine itemsBudgetShare
Sewer1$2M34%
Water Supply1$300K4%
Water Distribution4$4M62%

Wastewater treatment plants in Wyandotte

2 publicly owned treatment plants in Wyandotte with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Wyandotte Wastewater Plant26.9MI00211565
Southgate-Wyandotte Cso Rtf16.88MI00360722

Other Michigan cities with capital plans

Wyandotte capital plan questions

Sources and methodology

Budgets and years are as published in Wyandotte’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2023–2028 (6 line items).

Data refreshed September 11, 2026.