6 line items · $7M · 1 plan
Wyandotte's published capital plans list 6 water, sewer and wastewater line items with a combined planning budget of $7M, of which 1 items worth $2M sit in the wastewater and sewer departments. The largest single item is City Sewer Improvements at $2M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | City Sewer Improvements | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2028 |
| 2 | Water Main Replacement | Water Distribution | Water mains and distribution | $2M | 2025–2028 |
| 3 | Service Line Replacement | Water Distribution | Water mains and distribution | $2M | 2025–2028 |
| 4 | Water Meter Replacement | Water Supply | Meters and AMI | $300K | 2025–2028 |
| 5 | Advanced Metering Infrastructure (AMI) | Water Distribution | Meters and AMI | $200K | 2025 |
| 6 | Rebuild High/Low Service Pump & Motor | Water Distribution | Pump stations | $200K | 2025–2028 |
Descriptions, page references and contacts for Wyandotte
Klarifi holds every Wyandotte line item with its description, the page it appears on and the source document, plus 13 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$7M
6 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 1 | $2M | 34% |
| Water Supply | 1 | $300K | 4% |
| Water Distribution | 4 | $4M | 62% |
2 publicly owned treatment plants in Wyandotte with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Wyandotte Wastewater Plant | 26.9 | MI0021156 | 5 |
| Southgate-Wyandotte Cso Rtf | 16.88 | MI0036072 | 2 |
Sources and methodology
Budgets and years are as published in Wyandotte’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2023–2028 (6 line items).