44 line items · $131M · starting 2026–2029 · 1 plan
Springfield's published capital plans list 44 water, sewer and wastewater line items with a combined planning budget of $131M, of which 44 items worth $131M sit in the wastewater and sewer departments. The largest single item is Southwest Treatment Plant - Headworks Renewal and Improvements at $15M (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Southwest Treatment Plant - Headworks Renewal and Improvements | Wastewater | Headworks, screening and grit | $15M | 2028–2029 |
| 2 | Environmental Services Operations Facility | Wastewater | Planning, studies and asset management | $14M | 2025–2027 |
| 3 | Sanitary Sewer Overflow Reduction Project - Lower Wilson Parallel Trunk | Sewer | Sewer rehabilitation and I&I | $11M | 2026–2028 |
| 4 | Southwest Treatment Plant - Biogas Conversion to Renewable Natural Gas | Wastewater | Anaerobic digesters and biogas | $8M | 2025 |
| 5 | Shared Cost Sanitary Sewer Construction - Developer Agreements | Sewer | Sewer rehabilitation and I&I | $8M | 2025–2029 |
| 6 | Southwest Treatment Plant - Cryogenic Plant Improvements | Wastewater | Wastewater treatment plant upgrades | $8M | 2026–2027 |
| 7 | Northwest Wastewater Treatment Plant - Sludge Storage Renovation and Expansion | Wastewater | Biosolids, sludge and dewatering | $7M | 2027–2028 |
| 8 | Southwest Treatment Plant - Disinfection Capacity Expansion | Wastewater | Disinfection and UV | $6M | 2028–2029 |
| 9 | Sanitary Sewer District Construction Program Funded by Sanitary Sewer Reserves | Sewer | Sewer rehabilitation and I&I | $5M | 2025–2029 |
| 10 | Sanitary Sewer Overflow Reduction Project - System Capacity Improvement Projects | Sewer | Sewer rehabilitation and I&I | $5M | 2025–2029 |
34 more line items in Springfield, with descriptions and contacts
Klarifi holds every Springfield line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$55M
24 items
2026
$33M
9 items
2027
$11M
5 items
2028
$26M
4 items
2029
$7M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 25 | $77M | 59% |
| Sewer | 19 | $54M | 41% |
2 publicly owned treatment plants in Springfield. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Southwest WWTP | 25.32 | MO0049522 | 0 |
| Springfield NW WWTP | 4.06 | MO0103039 | 0 |
Sources and methodology
Budgets and years are as published in Springfield’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (44 line items).