36 line items · $34M · starting 2026–2029 · 1 plan
Hannibal's published capital plans list 36 water, sewer and wastewater line items with a combined planning budget of $34M, of which 13 items worth $8M sit in the wastewater and sewer departments. The largest single item is Lead Service Line Replacement at $15M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Lead Service Line Replacement | Water Distribution | Lead service line replacement | $15M | 2025–2030 |
| 2 | Pre-Sedimentation Basin | Water Supply | Clarifiers and settling | $3M | 2028–2030 |
| 3 | Downtown Sanitary Sewer Overflow (SSO) Elimination | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2030 |
| 4 | Grit Chamber / Bar Screen / Influent Pump | Wastewater | Headworks, screening and grit | $2M | 2027–2029 |
| 5 | Pump House Upgrade | Water Supply | Pump stations | $2M | 2026–2028 |
| 6 | Infrastructure Renewal/Replacement | Water Distribution | Water mains and distribution | $1M | 2025–2030 |
| 7 | Water Line/Hydraulic Upgrades for Industrial Area | Water Distribution | Water mains and distribution | $950K | 2029–2030 |
| 8 | Clarifier Rehab | Wastewater | Clarifiers and settling | $800K | 2025–2028 |
| 9 | Water Meters | Water Distribution | Meters and AMI | $800K | 2025–2030 |
| 10 | West Side Booster Station | Water Distribution | Pump stations | $750K | 2029–2030 |
26 more line items in Hannibal, with descriptions and contacts
Klarifi holds every Hannibal line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$24M
22 items
2026
$3M
7 items
2027
$2M
1 items
2028
$4M
3 items
2029
$2M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $4M | 11% |
| Sewer | 6 | $4M | 12% |
| Water Supply | 14 | $7M | 21% |
| Water Distribution | 9 | $19M | 56% |
2 publicly owned treatment plants in Hannibal with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Hannibal Pws | 2.69 | MO0093513 | 0 |
| Lake Hannibal Estate WWTF | 0.56 | MO0094200 | 3 |
Sources and methodology
Budgets and years are as published in Hannibal’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (36 line items).
Data refreshed September 11, 2026.