Columbia, Missouri: water and wastewater capital improvement projects

31 line items · $50M · starting 2026–2029 · 1 plan

Columbia's published capital plans list 31 water, sewer and wastewater line items with a combined planning budget of $50M, of which 21 items worth $31M sit in the wastewater and sewer departments. The largest single item is Annual Sewer Rehabilitation at $14M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Columbia

The 10 largest water, sewer and wastewater line items in Columbia’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Annual Sewer RehabilitationSewerSewer rehabilitation and I&I$14M2025–2029
2WWTP New Digester AdditionSewerAnaerobic digesters and biogas$8M2026–2029
32MG Elevated Storage - PrathersvilleWater SupplyStorage tanks and reservoirs$5M2028–2029
4Tower and Reservoir MaintenanceWater DistributionStorage tanks and reservoirs$4M2025–2029
5Annual Sewer System ImprovementsSewerSewer rehabilitation and I&I$3M2025–2029
6New Service LinesWater DistributionWater mains and distribution$2M2025–2029
7Alluvial Wells #19 AND #20Water SupplyWells and groundwater$2M2027–2029
8WWTP SCADA System ReplacementSewerSCADA, controls and instrumentation$2M2025
916" Transmission Main to Prathersville TankWater DistributionWater mains and distribution$2M2028
10Gibbs Road/Dawn DriveWater DistributionWater mains and distribution$1M2027

21 more line items in Columbia, with descriptions and contacts

Klarifi holds every Columbia line item with its description, the page it appears on and the source document, plus 5 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$25M

8 items

2026

$10M

7 items

2027

$6M

10 items

2028

$7M

2 items

2029

$2M

4 items

By department

Line items and planning budgets by department, Columbia.
DepartmentLine itemsBudgetShare
Sewer21$31M63%
Water Supply4$8M16%
Water Distribution6$11M21%

Project types in Columbia's plan

Wastewater treatment plants in Columbia

13 publicly owned treatment plants in Columbia with 70 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Bcrsd Rocky Fork WWTP0.21MO013729411
Bcrsd South Route K WWTP0.06MO00871730
Bcrsd Prairie Meadows WWTP0.05MO00835420
Bcrsd Kinkade Crossing WWTP0.05MO01335154
Bcrsd Midway Crossings WWTF0.03MO013270512
Bcrsd Meadow Village WWTP0.02MO00984424
Bcrsd Trails West WWTF0.008MO00920026
Bcrsd Brookfield Estates WWTP0.0049MO01266244
Bcrsd Richardson Acres WWTF0.0039MO01151853
Bcrsd Highfield Acres WWTF0.0023MO005337614
Bcrsd Brown Station WWTP0.0012MO01353055
Bcrsd Twin Lakes WWTF0.001MO01018850
Columbia WWTPMO00978377

Other Missouri cities with capital plans

Columbia capital plan questions

Sources and methodology

Budgets and years are as published in Columbia’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (31 line items).

Data refreshed September 11, 2026.