Wentzville, Missouri: water and wastewater capital improvement projects

57 line items · $54M · starting 2026–2029 · 1 plan

Wentzville's published capital plans list 57 water, sewer and wastewater line items with a combined planning budget of $54M, of which 33 items worth $11M sit in the wastewater and sewer departments. The largest single item is Waterline Extensions and Replacement at $13M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Wentzville

The 10 largest water, sewer and wastewater line items in Wentzville’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Waterline Extensions and ReplacementWater DistributionWater mains and distribution$13M2025–2028
2Deep Aquifer Water Well and StorageWater SupplyWells and groundwater$12M2025–2026
3New Water Storage Tank with Water Main ImprovementsWater SupplyWater mains and distribution$9M2025–2026
42-MG GM Ground Storage Tank Coating Interior and Booster Pump RebuildWater SupplyPump stations$3M2025–2026
5Bypass Trunk ReliefSewerLift stations$2M2025–2026
6Coating Interior and Exterior of Tower #2Water SupplyStorage tanks and reservoirs$1M2026–2027
7In-House Waterline InterconnectionsWater DistributionWater mains and distribution$1M2025–2029
8Warehouse/Office Hauled Waste FacilityWastewaterBuildings, HVAC and site work$1M2026–2027
9Highway 64 Force Main CasingSewerForce mains and interceptors$1M2028
10Crossroads Trunk ReliefWastewaterLift stations$835K2029

47 more line items in Wentzville, with descriptions and contacts

Klarifi holds every Wentzville line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$47M

33 items

2026

$3M

7 items

2027

$637K

7 items

2028

$2M

4 items

2029

$2M

6 items

By department

Line items and planning budgets by department, Wentzville.
DepartmentLine itemsBudgetShare
Wastewater15$4M8%
Sewer18$7M13%
Water Supply8$26M49%
Water Distribution16$17M31%

Project types in Wentzville's plan

Wastewater treatment plants in Wentzville

4 publicly owned treatment plants in Wentzville with 12 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Wentzville Pws4.34MO00935994
Dcsd, Treatment Plant 40.51MO01364252
Sccpwsd#2, Castlegate Mhp And Providence0.03MO00578011
Sccpwsd#2, Boone Ridge Estates WWTF0.0093MO01265945

Other Missouri cities with capital plans

Wentzville capital plan questions

Sources and methodology

Budgets and years are as published in Wentzville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (57 line items).

Data refreshed September 11, 2026.