6 line items · $3M · starting 2026–2029 · 1 plan
Corning's published capital plans list 6 water, sewer and wastewater line items with a combined planning budget of $3M, of which 1 items worth $1M sit in the wastewater and sewer departments. The largest single item is WWTP Boiler Replacement at $1M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | WWTP Boiler Replacement | Wastewater | Wastewater treatment plant upgrades | $1M | 2026 |
| 2 | Main Replacement | Water Distribution | Water mains and distribution | $1M | 2026–2030 |
| 3 | Well Disinfection | Water Supply | Disinfection and UV | $350K | 2026 |
| 4 | Water Well #3 | Water Supply | Wells and groundwater | $170K | 2027 |
| 5 | Houghton Plot - Hydrant/Valve Replacement | Water Supply | Water mains and distribution | $158K | 2026 |
| 6 | Pickup Truck | Water Supply | Vehicles and equipment | $58K | 2029 |
Descriptions, page references and contacts for Corning
Klarifi holds every Corning line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$3M
4 items
2027
$170K
1 items
2029
$58K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $1M | 41% |
| Water Supply | 4 | $736K | 25% |
| Water Distribution | 1 | $1M | 34% |
2 publicly owned treatment plants in Corning with 18 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Corning (c) WWTP | 0.81 | NY0025721 | 7 |
| South Corning WWTP | 0.06 | NY0110531 | 11 |
Sources and methodology
Budgets and years are as published in Corning’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (6 line items).
Data refreshed September 11, 2026.