50 line items · $92M · starting 2026–2029 · 1 plan
Delaware's published capital plans list 50 water, sewer and wastewater line items with a combined planning budget of $92M, of which 27 items worth $43M sit in the wastewater and sewer departments. The largest single item is Upground Reservoir at $39M (2026–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Upground Reservoir | Water Supply | Storage tanks and reservoirs | $39M | 2026–2029 |
| 2 | Northeast Olentangy Interceptor | Wastewater | Force mains and interceptors | $25M | 2027 |
| 3 | South Industrial Loop Sewer | Wastewater | Sewer rehabilitation and I&I | $5M | 2025 |
| 4 | US 42 Sewer Extension | Wastewater | Sewer rehabilitation and I&I | $3M | 2025 |
| 5 | South Industrial Loop Watermain | Water Distribution | Water mains and distribution | $2M | 2025 |
| 6 | Sewer Oversizing/Extension | Wastewater | Sewer rehabilitation and I&I | $2M | 2025–2029 |
| 7 | Southeast 2MG Water Tank Painting | Water Distribution | Storage tanks and reservoirs | $1M | 2025 |
| 8 | Process Pump Replacement | Wastewater | Pump stations | $1M | 2025–2029 |
| 9 | Plant Maintenance | Wastewater | Wastewater treatment plant upgrades | $1M | 2025–2029 |
| 10 | New Line Oversizing/Extension | Water Distribution | Water mains and distribution | $1M | 2025–2029 |
40 more line items in Delaware, with descriptions and contacts
Klarifi holds every Delaware line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$22M
20 items
2026
$40M
8 items
2027
$27M
10 items
2028
$2M
9 items
2029
$213K
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 25 | $43M | 46% |
| Sewer | 2 | $170K | 0% |
| Water Supply | 8 | $42M | 46% |
| Water Distribution | 15 | $7M | 8% |
2 publicly owned treatment plants in Delaware with 10 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Alum Creek WWTP | 4.87 | OH0121380 | 8 |
| Upper Olentangy Water Reclamation Center | 3.68 | OH0024911 | 2 |
Sources and methodology
Budgets and years are as published in Delaware’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (50 line items).
Data refreshed September 11, 2026.